34
EFT/ Burst Generator PEFT Junior
6.1.3 Coupling path options COUPLING PATH
6.1.3.1 Single phase coupling
The integrated coupling filter enables the following path selections:
Coupling path selection
Coupling path selection
- PATH L
- PATH N
- PATH PE
- PATH L+N
- PATH L+PE
- PATH N+PE
- PATH L+N+PE
Phase 1
Neutral
Protection earth
Phase and neutral
Phase and Protection earth
neutral and Protection earth
All coupling paths simultaneously
HAEFELY
P90.1
CONTROL UNIT
F1
F2
F3
F4
1ph coupling path:
→
PATH L ON
PATH N OFF
PATH PE OFF
→
By selecting all three modes to ON the paths
will be switched successively after test time
has expired.
Single phase
coupling menu
6.1.3.2 Three phase coupling
The external three phase coupling filter type FP-EFT 32.1 enables the following path selections
( all are referenced to GND):
Coupling path selection
Coupling path selection
- PATH L1
Phase 1
- PATH L2
Phase 2
- PATH L3
Phase 3
- PATH N
Neutral
- PATH PE
Protection earth
- PATH L1+N
Phase 1 and neutre
- PATH L1+PE
Phase 1 and Protection earth
- PATH N+PE
Neutral and Protection earth
- PATH L1+N+PE
Phase 1, neutral and Protection earth
- PATH L123
Phase 1, 2 and 3
- PATH L123+N
Phase 1, 2, 3 and neutral
- PATH L123+PE
Phase 1, 2, 3 and Protection earth
- PATH L123+N+PE
All coupling paths simultaneously