ARITERM SWEDEN AB
Installation, Operation & Maintenance -
2009.02.18- 5/32
B 20/30 the new generation pellet boiler is equipped with a 20/30 kW built-
in pellet burner. A pellet burner has many similarities with an oil burner. The dif-
ference is that heating with solid fuel produces ash that must be regularly removed to
prevent loss of efficiency or impairment of burner performance. The boiler is designed
to meet highest requirements as to operational reliability, convenience, and safety.
B 20/30 belongs to the most efficient state-of-the art pellet boilers in today’s
marketplace. Optimal combustion efficiency and good insulation allows for a high
coefficient of performance while emissions to the environment are kept at a low level.
The boiler has automatic ignition but can always be ignited manually, if required. It
has two ignition programs depending on whether the burner is started from the OFF
position or from operating mode. Operation of the boiler and its feed system are fully
automated and are regulated in three steps by the built-in control system. In the burn
pot, pellets are mixed with air to the ideal proportion to ensure complete combustion
in a cost effective manner.
B 20/30 are equipped with an oversized
ash box to facilitate maintenance work. Sweeping is mainly done from the soot-hatch
on top of the boiler but also through the rebox door after the burner is pulled out.
B 20/30 consists of a combustion
chamber with flue pipes enclosed by a jacket
holding 140/142 litres of water. Heat generated by
the burner is transferred to the boiler water via
the combustion chamber and the flue pipes.
Heat for the radiator system is transferred via a
4-way shunt valve. In the shunt valve the boiler
water is mixed with return water from the radiators
so that a constant, correct temperature can be
maintained in the radiators in relation to the outdoor
temperature. This is a means to achieve better
heating economy.
Small dimensions for easy installation
Thanks to its modest dimensions B 20/30 can be installed in boiler rooms
that would normally be considered too small. Most of the piping connections are
placed on top of the boiler. The terminal block for electric installation is accessible
from the control panel. Service work is facilitated by the fact that all connections and
components are easily accessible from the front. Sweeping takes place through the
rebox door or through a cleaning hatch on top of the boiler. Ashes collect in the oversi-
zed ash box that is attached to the ash door. The ash box holds 50 litre of ash and is
emptied when necessary.
Hot tap water
The efficient plate heat exchanger will ensure that you always get “fresh” hot tap water.
A strainer has been installed in the cold water line to prevent the heat exchanger from
becoming clogged (the water quality should be checked).
The internal circulation pump is controlled by a flow switch, fitted on the hot water
outlet pipe. The whole heat-exchanger package is located behind the electric panel and
is easily accessible for service work.
ATTENTION!
Before servicing, disconnect the power to the boiler by switching off the
mains switches. Work on the boiler may only be carried out by a qualified electrician.
Front view of the heat exchanger
installation for hot tap water.
1. Plate heat exchanger
2. Internal circulation pump
OPERATING PRINCIPLE
The shunt valve can be regulated either manually or
automatically with a regulating device (optional).
1
Flow switch
cw hw
Strainer
2
Содержание Biomatic plus 50
Страница 10: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 10 32 WIRING DIAGRAM ...
Страница 25: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 25 32 FEEDING SYSTEM DEPO FEEDO 606 mm 1500 mm ...
Страница 27: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 27 32 MANUFACTURES DECLARATION ...
Страница 28: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 28 32 NOTES ...
Страница 29: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 29 32 NOTES ...
Страница 30: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 30 32 NOTES ...