ARITERM SWEDEN AB
Installation, Operation & Maintenance -
2009.02.18- 2/32
CONTENTS
Keep this instruction manual readily available for future use.
•
Read the instructions carefully before taking your pellets installation into service.
•
The capacity of the burner is calculated according to the maximum volume of
•
pellets that can be fed to and burnt in the burn pot during 1 hour (based on a
normal, average wood pellets quality as described in our fuel specification)
Follow these instructions carefully and carry out care and maintenance work as
•
recommended.
Notification to building authority
Attention! When you change heating installation this must always be
communicated to the local building authorities.
Sweeping
According to the fire protection laws a chimney shall be swept regularly. This is done
by the local chimneysweep.
Sweeping of the boiler shall be carried out in such a
manner that good operating
economy is achieved. (see under ”Maintenance”) Prepare
to chimney-sweeping by turning off the boiler at least one hour before cleaning to
minimize the amount of glowing ash.
Warning!
Make sure to cut the power supply to the boiler before removing the burner
housing.
Maintenance contract
Ariterm recommends the boiler installation to be made by a company with professio-
nal competence. For more information please contact your Ariterm retailer.
Replacing of spare parts
Ariterm recommends that replacing of spare parts is made by authorized serviceman
of Ariterm retailer. The retailer supplies required spare parts and authorized service-
man makes the necessary adjustments and combustion gas analysis when replacing
spare parts.
IMPORTANT INFORMATION
Important Information .....................................................................2
Dimensions / Items included / Technical Data ........................ 3-4
Operating Principle ..........................................................................
5
Safety and Alarms .............................................................................
6
Installation .........................................................................................
7
Water Piping .....................................................................................
7
VVS Installation ........................................................................... 8-9
Filling of Water .................................................................................9
Wiring Diagram ..............................................................................10
Control Panel ..................................................................................11
Control Computer and Menus ......................................................11
Settings ............................................................................................12
Burner Overview .............................................................................12
Start-up in OFF Mode ...................................................................13
Start-up in Operating Mode .........................................................13
Displayed Messages ..................................................................14-15
Actions Chart +20 .........................................................................16
Actions Chart +30 .........................................................................17
Troubleshooting ........................................................................18-19
Maintenance, Care, Sweeping ..................................................20-21
Advice about Fuel Pellets ...............................................................22
Guarantee ........................................................................................22
Storage Planning .............................................................................22
Feeding System .........................................................................23-26
Manufactures Declaration .............................................................27
Notes .........................................................................................28-30
Installation Protocol.... ...................................................................31
Содержание Biomatic plus 50
Страница 10: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 10 32 WIRING DIAGRAM ...
Страница 25: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 25 32 FEEDING SYSTEM DEPO FEEDO 606 mm 1500 mm ...
Страница 27: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 27 32 MANUFACTURES DECLARATION ...
Страница 28: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 28 32 NOTES ...
Страница 29: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 29 32 NOTES ...
Страница 30: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 30 32 NOTES ...