![Ariston ACO 27 MFFI Скачать руководство пользователя страница 56](http://html.mh-extra.com/html/ariston/aco-27-mffi/aco-27-mffi_installation-and-servicing-instructions_2970931056.webp)
56
7.3.5. R
EMOVING THE
H
EAT
E
XCHANGER
1.
Drain the boiler;
2.
Remove the six nuts “L” (F
IG
. 7.16);
3.
Remove the C.H. flow and return temperature probe
unscrewing the screws “M” (F
IG
. 7.16);
4.
Remove the front cover;
5.
Unscrew the two allen screws “N” (F
IG
. 7.17) and
remove the clip (7.18);
6.
Remove the “U” clip “O” (F
IG
. 7.19) and remove the
C.H. flow water pipe (F
IG
. 7.20);
7.
Remove the “U” clip “P” (F
IG
. 7.21) and remove the
C.H. return water pipe (F
IG
. 7.22);
8.
Pull forward the heat exchanger (F
IG
. 7.23 - 7.24).
F
IG
. 7.16
F
IG
. 7.17
F
IG
. 7.14
F
IG
. 7.15
7.3.4. R
EMOVING THE
E
LECTRODES
1.
Remove the two allen screws “K”, pulling off the ignition
cable (F
IG
. 7.14);
3.
Extract the electrodes (F
IG
. 7.15).
K
L
M
N
N
M
L
L
L
L
L
IMPORTANT!!
Every time that the combustion chamber cover or the
primary heat exchanger is removed from the boiler, the
combustion chamber seal must be checked and where
necessary replaced (code: 65102217). The silicone
grease provided with the gasket must be spread
around the area the gasket fits to ensure an airtight
seal.
Only the grease provided must be used, however,
should more grease be needed it must have a
temperature range of between –40 deg C and +200
deg C”
Содержание ACO 27 MFFI
Страница 49: ...49 WIRING DIAGRAM FOR CONNECTION TO AN ARISTON UNVENTED CYLINDER DIAGRAM A ...
Страница 50: ...50 WIRING DIAGRAM FOR CONNECTION TO AN OPEN VENTED CYLINDER DIAGRAM B ...
Страница 57: ...57 FIG 7 19 FIG 7 20 FIG 7 21 FIG 7 22 FIG 7 23 FIG 7 24 O P FIG 7 18 ...
Страница 69: ...69 Model 27 32 RFFI SYSTEM ...
Страница 70: ...70 ...
Страница 71: ...71 ...
Страница 77: ...77 ...
Страница 78: ...78 11 BENCHMARK COMMISSIONING CHECKLIST ...
Страница 79: ...79 12 SERVICE INTERVAL RECORD ...