15
Fig. 2.12
2.9.2 F
ITTING THE
5” F
LUE
(Ø 80 / 125 H
ORIZONTAL
/
VERTICAL
)
Should the flue require extending, the flue connections are
push fit, however, one flue bracket should be used to secure
each metre of flue.
N
OTE
: S
EE PAGE
19
FOR MAXIMUM AND MINIMUM FLUE RUNS
.
Once the boiler has been positioned on the wall, it is
necessary to insert the
Ø
80/125 adaptor (
F
IG
. 2.13
) for both
horizontal and vertical flue runs into the boiler flue socket (not
supplied with flue kit -
Part No 3318095
).
Push the adaptor onto the boilers flue connection, grease the
seals then add extensions or elbows as required, secure the
adaptor, using the clamp and screws provided.
To fit extensions or elbows it is first necessary to ensure that
the lip seal is fitted correctly into the inner flue, once verified,
it is simply necessary to push them together, no clamps are
necessary to secure the flue components.
Before proceeding to fit the flue, ensure that the maximum
flue length has not been exceeded (See the tables on Page
19) and that all elbows and bends have been taken into
consideration, the maximum flue length is 10 metres, for each
additional 90
o
elbow 1 metre must be subtracted from the
total flue length, and for each 45
o
0.5 metres must be
subtracted from the total flue length
(the height of the
vertical adaptor and a 45
o
bend can be seen in Fig. 2.14
and a 90
o
bend in Fig. 2.15)
.
N
OTE
:
DO NOT
CUT THE VERTICAL FLUE KIT
.
Screws
Clamp
Seal
Fig. 2.13
Fig. 2.14
Fig. 2.15
Содержание ACO 27 MFFI
Страница 49: ...49 WIRING DIAGRAM FOR CONNECTION TO AN ARISTON UNVENTED CYLINDER DIAGRAM A ...
Страница 50: ...50 WIRING DIAGRAM FOR CONNECTION TO AN OPEN VENTED CYLINDER DIAGRAM B ...
Страница 57: ...57 FIG 7 19 FIG 7 20 FIG 7 21 FIG 7 22 FIG 7 23 FIG 7 24 O P FIG 7 18 ...
Страница 69: ...69 Model 27 32 RFFI SYSTEM ...
Страница 70: ...70 ...
Страница 71: ...71 ...
Страница 77: ...77 ...
Страница 78: ...78 11 BENCHMARK COMMISSIONING CHECKLIST ...
Страница 79: ...79 12 SERVICE INTERVAL RECORD ...