66
7.6.1. C
HECKING THE
F
USES
1.
Remove the inspection cover of the PCB box (F
IG
.
7.64);
2.
Remove the fuses by pushing and rotating fuse holders
“B9” (F
IG
. 7.65).
7.6
A
CCESS TO THE
C
ONTROL
S
YSTEM
F
IG
. 7.64
F
IG
. 7.65
B9
7.6.2. R
EMOVING THE
P.C.B.
S
1.
Remove the inspection cover of the PCB box (F
IG
.
7.66);
2.
Unplug all the electrical connections (F
IG
. 7.67);
3.
Unscrew the screws “C1” (F
IG
. 7.67);
4.
Pull forward the main PCB (F
IG
. 7.68);
5.
Unscrew the screws “C2” (Fig. 7.69);
6.
Remove the cover of the control panel (F
IG
. 7.70);
7
. Unscrew the display P.C.B. mounting screws “C3” and
disconnect the P.C.B. connection cable “C4” (F
IG
. 7.71);
8.
Remove the display P.C.B. (F
IG
. 7.72);
9.
Replace either P.C.B. in reverse order.
F
IG
. 7.68
F
IG
. 7.66
F
IG
. 7.67
C1
Содержание ACO 27 MFFI
Страница 49: ...49 WIRING DIAGRAM FOR CONNECTION TO AN ARISTON UNVENTED CYLINDER DIAGRAM A ...
Страница 50: ...50 WIRING DIAGRAM FOR CONNECTION TO AN OPEN VENTED CYLINDER DIAGRAM B ...
Страница 57: ...57 FIG 7 19 FIG 7 20 FIG 7 21 FIG 7 22 FIG 7 23 FIG 7 24 O P FIG 7 18 ...
Страница 69: ...69 Model 27 32 RFFI SYSTEM ...
Страница 70: ...70 ...
Страница 71: ...71 ...
Страница 77: ...77 ...
Страница 78: ...78 11 BENCHMARK COMMISSIONING CHECKLIST ...
Страница 79: ...79 12 SERVICE INTERVAL RECORD ...