76
To ensure that the five year guarantee applies, the following checks must be carried out once a year and the service
history completed in the Service Interval Record (Section 12, page 79) by a CORGI registered engineer:
1.
Visually check the appliance for correct installation;
2.
Check the appliance for the correct operation;
3.
Check the flue and flue installation for correct siting, installation and that it is in good condition.;
4.
Remove the casing as described in Section 7.2;
5.
Check the operation of the safety devices:
- Air Pressure Switch;
- Overheat Thermostat;
- Safety Valve;
- Low Water Pressure Switch;
- Ionisation (Flame Detection);
6.
Drain the boiler and check the pressure in the expansion vessel, ensuring it is 0.7 bar;
7.
Remove, clean and refill the condensate trap and condensate hoses (see Section 7.3.6 and 7.3.7), check
the drain system for correct discharge of condensate and clean if necessary;
8.
Remove and clean the DHW flow switch;
9.
Remove and clean the fan;
10.
Remove and clean the electrodes with an emery cloth;
11.
Remove and clean the burner;
12.
Check and clean the primary heat exchanger as necessary;
13.
Refill the boiler and check the following;
14.
Check all electronic operation parameters are correct (see Section 3.6);
15.
Check gas inlet pressure and correct working pressure;
16.
Check the CO
2
(see Section 3.6.3) and adjust as necessary;
17.
Check the gas rate;
18.
Check the correct operations of the timeclock and room thermostat;
19.
Check the DHW flow rates;
20.
Advise the customer on the correct use of the appliance (clock setting and operation, repressurising etc.);
21.
Complete the necessary paperwork, Service Interval Record (page 79, Section 12) and Annual Maintenance
Checklist.
10.
ANNUAL MAINTENANCE
CHECKLIST
Содержание ACO 27 MFFI
Страница 49: ...49 WIRING DIAGRAM FOR CONNECTION TO AN ARISTON UNVENTED CYLINDER DIAGRAM A ...
Страница 50: ...50 WIRING DIAGRAM FOR CONNECTION TO AN OPEN VENTED CYLINDER DIAGRAM B ...
Страница 57: ...57 FIG 7 19 FIG 7 20 FIG 7 21 FIG 7 22 FIG 7 23 FIG 7 24 O P FIG 7 18 ...
Страница 69: ...69 Model 27 32 RFFI SYSTEM ...
Страница 70: ...70 ...
Страница 71: ...71 ...
Страница 77: ...77 ...
Страница 78: ...78 11 BENCHMARK COMMISSIONING CHECKLIST ...
Страница 79: ...79 12 SERVICE INTERVAL RECORD ...