32
Quality for Professionals
15.2 Top link lifting unit sensor
Order number:
Item no.: 00410-2-169
Connection:
12-pin plug on the control box
The slider on the ES 100 M3 Special is opened and closed automatically.
Cable length:
4 m
Installation position:
Since most soil tillage
implements are lifted and
lowered during their operation,
installing the sensor on the
implement's three-point linkage
is the best method. However,
the sensor can also be attached
at other positions that have
mechanical movement. For
semi-mounted soil tillage
implements, the sensor can be
installed on the chassis,
because the lifting unit is not
used in this case.
If the working position is to be turned, the OK button and the ON/OFF button must be
pressed simultaneously when switching on.
The following appears on the display:
Items included:
1 sensor,
1 fastening plate incl. fastening bolts
NOTE:
the sensor must not be bolted on too strongly (tension)!
The slider is only opened when the spreading plate is rotating!
Three-point linkage
signal
Inverted!
Fig.: 17
Fig.: 18