•
2 Rivets
•
1 Black cable guide
•
2 Littelfuse 30 A Fuses (ATO Series)
•
12 Cable grommets (4 different types)
•
2 Frame seals
•
2 Cable guides (2 different types)
•
2 Rubber clamps
•
1 Pipe clamp
•
1 M4x6 TCB screw
•
1 Pipe clamp
•
1 Screw
Motorcycle division
The wiring timing is subdivided in three essential
sections, as indicated in the figure.
1. Front section
2. Central section
3. Rear section
SPECIAL CHECKS FOR THE CORRECT CONNECTION AND LAYING OF CABLES
Carry out the checks described below once the electrical system is refitted, connectors recon-
nected and clamps and retainers restored.
•
Check the connector block for connections and correct tightening in the following connec-
tors.
1. Secondary Lock Connector.
2. Instrument panel connector: FRONT SECTION, TABLE B1.
3. Throttle grip position sensor connectors, CENTRAL SECTION, TABLE A2.
4. Pick-up connector
5. Side Stand Switch Connector: CENTRAL SECTION, TABLES V1, V2, V3.
6. Regulator Connector: CENTRAL SECTION, TABLE N.
7. Front cylinder coil and rear cylinder coil connectors: CENTRAL SECTION, TABLES I1, I2 (as-
sembly diagrams under table D).
8. Control Unit Connectors: CENTRAL SECTION, TABLES A6, A7.
9. Fuel pump connector: CENTRAL SECTION, TABLES M1, M2, M3.
10.Connectors inside the housing, behind the radiator: - Key Connector - Right Light Switch Con-
nectors - Left Light Switch Connectors
11.ABS connector.
DORSODURO 1200 ABS - ATC
Electrical system
ELE SYS - 91
Manuals by Motomatrix / www.motomatrix.co.uk / The Solution For Lost Motorcycle Coded Keys.
email: [email protected]
Содержание DORSODURO 1200 ABS - ATC
Страница 408: ......