Unpacking and Preparation
This chapter describes how to set up and start the AT680 Leakage Current/IR Meter
Incoming Inspection
Power Requirements
Setting up the Fuse
Environmental Requirements
Cleaning
How to Remove the Handle
1.1 Incoming Inspection
After you receive the instrument, carry out checks during unpacking according to the
following procedure.
1.
Check that the packing box or shock-absorbing material used to package the
instrument has not been damaged.
2.
Referring to Table 1-1, check that all packaged items supplied with the meter have
been provided as per the specified optioned.
Table 1-1
Items Packaged with the meter
Name
Qty
Remark
User’s Manual
1
Power Cable
1
220V/50Hz
Fuse
2
250V, 1A Slow-blow
ATL680 Test Clip Leads
1
Warranty certificate
1
Includes Product
certification
1.2 Power Supply
Confirm that the power supplied to the AT680 meets the following requirements:
Voltage
:
100-120VAC
Frequency
:
47.5-52.5Hz
Power-consumption: 50VA max
WARNING
:
The ground wire should be earthed to avoid being electric shock.
If you change the power cord, make sure the ground wire earthed.