CHAPTER 2 Installation guide
13
C H A P T E R 2
Installation guide
Unpacking
Inspect the
transport box
for possible damage as it arrives. Immediately
inform the transport company in case of damage, otherwise she may not
accept any responsibility. Keep the transport box as it is designed for
optimum protection during transport and it may be needed again. Carefully
unpack the system and inspect it for completeness and for possible damage.
Contact your supplier in case of damage or if not all marked items on the
checklist are included.
Prior to shipment, your detector has been inspected and tested to ensure the
best possible performance. The results of the electronic tests are included in
the shipkit.
Installation
Please follow the next steps for a successful installation and start-up.
1.
To unpack the DECADE, lift it from its transport box by both hands as
indicated in Fig. 1A. In any other situation the DECADE should be lifted
by both hands under the unit as indicated in Fig. 1B.
Fig. 1. Lift instructions DECADE.
2. Inspect the system for possible damage and make sure that all marked
items on the checklist are included.
3. Check whether the voltage selector is in the correct position i.e. identical
with the voltage of your local power supply. If the triangle with the voltage
range is pointing towards the small white block, the system is set to that
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com