Commissioning
45
MAXXflo EVO
5.2.4 HEAT ENGINE COMMISSIONING COMPLETION
• Refit fan PWM connector onto the top heat exchanger, then press the RESET toggle switch for 1 second
to clear the control lockout.
• Once the lockout has been cleared from the display (bell symbol is not being displayed) close the door of
the heater and secure it with the two door clips.
•
T
urn the operation switch to ON or “I” and wait for both heat engines to ignite and operate at maximum
output.
• Keep the DHW tank temperature below 40
O
C (by opening water outlets). Check the total gas
consumption figure using the following table:
• The gas consumption must be within 5% of the gross kW input value of the data plate
• Turn off all taps and water draw offs.
• Change the DHW Set-point to back to 60
O
C to 65
O
C as required by the user
• Heat engine commissioning is complete
G20 GAS (38.8 MJ/m
³
)
Metric meter
Model
gross kW
input
Time taken to consume
0.1m
3
of gas
MAXXflo EVO 90
93.2
40s (+/- 2.0s)
MAXXflo EVO 120
124.3
30s (+/- 1.5s)
Содержание MAXXflo EVO CWH 90/302
Страница 2: ...General 2 MAXXflo EVO Blank Page...