138
Release:
2017
CyBio
®
Well
vario
A 1.5.2 Tubing
Reservoir filling station
The
pump
for
reservoir
filling
is
located
at
the
stacker.
The
pump's
direction
of
rotation
determines
the
direction
in
which
liquid
will
be
transported
(
Fig.
123: Direction of rotation and delivery of liquid for
peristaltic pump at the stacker
"Fill"
command:
The
rollers
of
the
peristaltic
pump
rotate
clockwise.
This
means
that
liquid
is
pumped
from
the
left
to
the
right.
The
left
tube
end
must
be
submerged
in
the
reagent
vessel
while
the
right
tube
end
connects
to
the
reservoir.
A 1.5.3 Inserting a Tube Into the Peristaltic Pump
1.
Turn
peristaltic
pump
lever
to
the
left
Pump is open.
2.
Insert
tube
in
same
direction
as
shown
in
.
3.
Return
lever
of
peristaltic
pump
into
rightmost
position.
4.
Push
right
and
left
tube
locks
into
locked
position.
Pump is closed and ready for operation.
Fig.
124: Insertion of tube into peristaltic pump
CAUTION
There
is
danger
of
crushing
or
pinching
while
the
pump
is
in
action.
Terminate
all
currently
running
system
programs
or
turn
system
power
off
before
you
begin
work
at
a
peristaltic
pump.
Содержание CyBio Well vario OL3381-25-300
Страница 1: ...Operating Manual CyBio Well vario...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 7: ......
Страница 8: ......
Страница 16: ...XVI Release 2017 CyBio Well vario...
Страница 26: ...10 Release 2017 CyBio Well vario Technical Specifications...
Страница 60: ...44 Release 2017 CyBio Well vario Technical Description...
Страница 74: ...58 Release 2017 CyBio Well vario Initial Start Up Routine Start Up Procedure...
Страница 138: ...122 Release 2017 CyBio Well vario Maintenance Care...
Страница 144: ...128 Release 2017 CyBio Well vario Accessories Spare Parts...
Страница 146: ...130 Release 2017 CyBio Well vario Waste Disposal...
Страница 148: ...132 Release 2017 CyBio Well vario...
Страница 158: ...142 Release 2017 CyBio Well vario...
Страница 160: ...144 Release 2017 CyBio Well vario...
Страница 164: ...148 Release 2017 CyBio Well vario...