
11 Maintenance
67
plicable to all fluids used in the baths should be kept in close proximity to
the instrument.
•
If the mains supply cord becomes damaged, replace it with a cord of the
appropriate gauge wire for the current of the bath. If there are any ques-
tions, call Amphenol Advanced Sensors Customer Service for more
information.
•
Before using any cleaning or decontamination method except those rec-
ommended by Hart, users should check with Amphenol Advanced
Sensors Customer Service to be sure that the proposed method will not
damage the equipment.
•
If the instrument is used in a manner not in accordance with the equip-
ment design, the operation of the bath may be impaired or safety hazards
may arise.
•
The over-temperature cutout should be checked every 6 months to see that
it is working properly. In order to check the user selected cutout, follow
the controller directions (Section 8.2, Reset Cutout) for setting the cutout.
Both the manual and the auto reset option of the cutout should be
checked. Set the bath temperature higher than the cutout. Check to see if
the display flashes cutout and if the temperature is decreasing.
Note:
When checking the over-temperature cutout, be sure that the temperature
limits of the bath fluid are not exceeded. Exceeding the temperature limits
of the bath fluid could cause harm to the operator, lab, and instrument.
Содержание Kaye CTR-40
Страница 1: ...M4436 Rev B 12 19 Kaye CTR 40 Cold Temperature Reference User s Guide...
Страница 2: ......
Страница 11: ......
Страница 17: ...1 Before You Start 6 Voltage Cut In 7 5 213 247 VAC...
Страница 19: ......
Страница 27: ......
Страница 32: ......
Страница 45: ......
Страница 65: ......
Страница 73: ......
Страница 83: ...72 12 Troubleshooting 12 3 Wiring Diagram Figure 9 Wiring Diagram...