18
Amico Clinical Solutions Corp.
!
WARNING – Risk of Flanged Ceiling Tube dropping:
• If the flanged ceiling tube drops, it may cause serious injury.
• Do NOT stand under the flanged ceiling tube during installation.
1. Determine the stop location of the central axis to esnure greatest range of motion.
2. Fit the threaded rods with the necessary components between the anchor plate and the flanged ceiling drop tube.
3. Push the flanged ceiling tube onto the six M16 threaded rods of the anchor plate.
4. Secure the flanged ceiling tube with two M16 hex nuts:
NOTE:
Precise horizontal alignment of the flanged ceiling tube is essential to ensure that the pendant system can
be removed easily and positioned reliably.
5. Complete the assembly by installing the rest of the hex nuts, flat washers and lock washers to the threaded rods.
6. Align the flanged ceiling tube horizontally by adjusting the M16 hex nuts. Check the horizontal alignment.
!
WARNING – Risk of Pendant System dropping:
Tighten the M16 hex nuts to 75 lbs-ft (torque).
7. Check that the flanged ceiling tube is securely in place.
Installation: Structure Plates and Flanged Ceiling Tube
Содержание ice 30m
Страница 1: ...Installation and Operation Instructions Surgical Lights w w w a m i c o c o m...
Страница 6: ...Typical Drawings Single Ceiling Mount Single Ceiling Mount for Low Ceiling Height Dual Ceiling Mount...
Страница 46: ...46 Amico Clinical Solutions Corp Operation The Amico iCE 30m LED Light Expanded Beam...