Calibration and Troubleshooting
5-2
TM-F2OP-C1XN-01
Adjustments to programming and readback accuracy for the power supply
are made using cover-off procedures which must be performed by a
service technician.
Calibration Setup
Service Environment and Precautions
•
Follow established antistatic procedures.
•
Work at a bench with adequate room and support for the unit under
test and for all equipment required.
•
To reduce shock hazard, use only an insulated, straight-blade
screwdriver when calibrating trim potentiometers.
•
NEVER calibrate these units alone. Ensure that someone is present
who can help should an accident occur.
Equipment Required
You will need the following equipment when calibrating your power
supply.
•
5 1/2 digit true RMS voltmeters (DVMs) (±0.05% accuracy) with test
leads
•
Current shunt 1 mV/A (±0.25%) and connecting wire. The
recommended current ratings for the DC shunt and connecting wire
must be at least 10% greater than the power supply's output current
rating. Please see Table 2-4 on page 2–13.
•
Non-conducting, straight-bladed screwdriver
WARNING: Shock hazard
Exercise caution when using and calibrating a power supply. High energy levels
can be stored at the output voltage terminals on a power supply in normal
operation. In addition, potentially lethal voltages exist in the power circuit and on
the output and sense connectors of a power supply with a rated output greater
than 40 V. Filter capacitors store potentially dangerous energy for some time
after power is removed.
Содержание Sorensen XFR 100-28
Страница 3: ...This page intentionally left blank ii...
Страница 5: ...This page intentionally left blank iv...
Страница 7: ...This page intentionally left blank vi...
Страница 13: ...xii...
Страница 15: ...xiv...
Страница 25: ...1 10...
Страница 67: ...3 18...
Страница 73: ...Remote Operation 4 6 TM F2OP C1XN 01 Figure 4 1 Connecting Programming Sources to J2 Connector...
Страница 75: ...4 8...
Страница 87: ...5 12...