2-4 SECTION 2 – OPERATING INSTRUCTIONS
Monitor Cable Connector
This connector is used for monitoring the ultrasonic signals within the test cell. Normally it
is not used. It may be used during system testing.
Top Transducer Connector
The coaxial cable attached to the top transducer must be mated to this connector prior to
beginning a test.
J Thermocouple Connector
The thermocouple that is attached to the top plug must be plugged into this connector prior to
the beginning of a test and any time that it is necessary for the temperature controller to
operate. If the thermocouple is not connected, the temperature controller will display “SBr”
and will not function.
Main Power Connection
Located beside the fuses, it requires a twist lock plug to connect the power. The power
required will be 208-240 VAC, 10A.
Fuses
There are two fuses (2.5A, 250VAC) located in the Instrument Power Receptacle. To check
these fuses, remove the power cord and pry off the access panel with a small screwdriver.
Right Rear Panel
The right rear panel contains all the connections for hydraulic and pneumatic utilities.
Air Inlet, Pump Water Drain/Inlet
These connectors are used to connect the pneumatic and hydraulic utilities.
High Pressure Inlet (optional)
This high-pressure connector exists so that pressure may be controlled with an
alternate pressure control system.
Содержание CHANDLER ENGINEERING 5265
Страница 10: ...P 6 PREFACE This page is intentionally left blank...
Страница 22: ...2 10 SECTION 2 OPERATING INSTRUCTIONS This page is intentionally left blank...
Страница 30: ...4 4 SECTION 4 TROUBLESHOOTING GUIDE This page is intentionally left blank...
Страница 34: ...6 2 SECTION 6 DRAWINGS AND SCHEMATICS 5265 DWGS REV C This page is intentionally left blank...
Страница 36: ......
Страница 37: ......
Страница 38: ...CHANDLER ENGINEERING...
Страница 39: ......
Страница 40: ...CHANDLER ENGINEERING...
Страница 41: ......