TABLE OF CONTENTS T-1
Table of Contents
General Information
................................................................
P-1
Introduction
............................................................................................................................
P-1
Description
.......................................................................................................................
P-1
Features and Benefits
............................................................................................................
P-1
Specifications
.........................................................................................................................
P-2
Safety Requirements
.............................................................................................................
P-3
Symbols Used on Equipment
.................................................................................................
P-4
Symbols Used in this Manual
................................................................................................
P-5
Section 1 – Installation
.............................................................
1-1
Unpacking the Instrument
.....................................................................................................
1-1
Re-configuration
...................................................................................................................
1-1
Connecting Serial Power
.......................................................................................................
1-2
Section 2 – Operating Instructions
...........................................
2-1
Front Panel Controls
.............................................................................................................
2-1
Air Inlet Gauge
................................................................................................................
2-1
Pump Pressure Adjust Regulator
.....................................................................................
2-1
Pump Air Pressure Gauge
................................................................................................
2-1
Relief Valve
.....................................................................................................................
2-1
Verification of Signal Strength
.............................................................................................
2-2
Running a Test
.......................................................................................................................
2-2
Relief Valve Shut-off
.......................................................................................................
2-2
Pump Switch
....................................................................................................................
2-2
Pump Water Switch
.........................................................................................................
2-2
Coolant Switch
................................................................................................................
2-2
Pressure Release Valve
....................................................................................................
2-3
Cylinder Pressure Gauge
..................................................................................................
2-3
Temperature Controller
....................................................................................................
2-3
Heater Switch
..................................................................................................................
2-3
Main Power Switch
..........................................................................................................
2-3
Instrument Power Switch
.................................................................................................
2-3
Left Rear Panel
................................................................................................................
2-3
Data Cable Connector
......................................................................................................
2-3
Ref Cable Connector
........................................................................................................
2-3
Monitor Cable Connector
.................................................................................................
2-4
Top Transducer Connector
...............................................................................................
2-4
J Thermocouple Connector
.............................................................................................
2-4
Main Power Connection
...................................................................................................
2-4
Fuses
................................................................................................................................
2-4
Right Rear Panel
..............................................................................................................
2-4
Air Inlet, Pump Water Drain/Inlet
...................................................................................
2-4
High Pressure Inlet (optional)
.........................................................................................
2-4
Operating the Instrument
.......................................................................................................
2-5
Preparing the Sample and Cell for a Test
..............................................................................
`Ìi`ÊÜÌ ÊÌ iÊ`iÊÛiÀÃÊvÊ
Содержание CHANDLER ENGINEERING 5265
Страница 10: ...P 6 PREFACE This page is intentionally left blank...
Страница 22: ...2 10 SECTION 2 OPERATING INSTRUCTIONS This page is intentionally left blank...
Страница 30: ...4 4 SECTION 4 TROUBLESHOOTING GUIDE This page is intentionally left blank...
Страница 34: ...6 2 SECTION 6 DRAWINGS AND SCHEMATICS 5265 DWGS REV C This page is intentionally left blank...
Страница 36: ......
Страница 37: ......
Страница 38: ...CHANDLER ENGINEERING...
Страница 39: ......
Страница 40: ...CHANDLER ENGINEERING...
Страница 41: ......