SECTION 2 – OPERATING INSTRUCTIONS 2-3
coolant switch in the OFF position to avoid possible temperature oscillations at
temperatures above room temperature.
Pressure Release Valve
Used to manually release pressure from the test cell. Valve must be closed during
testing except when it is necessary to manually release pressure. Valve must also
be closed when removing test cell with cooling water ON or else a significant
water leak will occur.
Cylinder Pressure Gauge
Displays the pressure inside the test cell.
Temperature Controller
Used to control the temperature in the test cell.
Heater Switch
Used to turn the flow of current to the heater ON or OFF. Switch must be in the
ON position during testing and should be in the OFF position as a safety
precaution at other times.
Main Power Switch
Used to turn the 220VAC power to the heater and internal solenoid valves
instrument ON or OFF. Switch must be in the ON position during testing.
Instrument Power Switch
Used to turn the power to the internal instrumentation ON or OFF. Switch must
be in the ON position during testing. The instrument power may be connected to
an uninterruptible power supply (UPS) if desired.
Left Rear Panel
The left rear panel contains all the connections for the
cables that connect the autoclave to the processor.
This panel also contains connections for the top
transducer, the thermocouple, the main power, and the
fuses.
Data Cable Connector
This connection is not used on the 5265 Autoclave.
Ref Cable Connector
This connection is not used on the 5265 Autoclave.
Содержание CHANDLER ENGINEERING 5265
Страница 10: ...P 6 PREFACE This page is intentionally left blank...
Страница 22: ...2 10 SECTION 2 OPERATING INSTRUCTIONS This page is intentionally left blank...
Страница 30: ...4 4 SECTION 4 TROUBLESHOOTING GUIDE This page is intentionally left blank...
Страница 34: ...6 2 SECTION 6 DRAWINGS AND SCHEMATICS 5265 DWGS REV C This page is intentionally left blank...
Страница 36: ......
Страница 37: ......
Страница 38: ...CHANDLER ENGINEERING...
Страница 39: ......
Страница 40: ...CHANDLER ENGINEERING...
Страница 41: ......