SECTION 1 – INSTALLATION 1-1
Section 1 – Installation
Unpacking the Instrument
Re-configuration
1.
Apply power to the instrument.
2.
Make sure the instrument is connected to serial port COM1 on the host computer.
3.
Turn ON the power to the instrument.
4.
Each data channel on each instrument must have a separate address. The DIP
switches at the rear of the instrument are used to configure the data channels.
During normal operation each of the four switches must be set to the OFF
position. During configuration of the address for the SGSA, temperature, or
pressure channels, the DIP switches on the autoclave must be set according to the
table below.
Channel Address Configuration
Normal Operation
Temperature
Pressure
SGSA (Gel and Transit Time)
Содержание CHANDLER ENGINEERING 5265
Страница 10: ...P 6 PREFACE This page is intentionally left blank...
Страница 22: ...2 10 SECTION 2 OPERATING INSTRUCTIONS This page is intentionally left blank...
Страница 30: ...4 4 SECTION 4 TROUBLESHOOTING GUIDE This page is intentionally left blank...
Страница 34: ...6 2 SECTION 6 DRAWINGS AND SCHEMATICS 5265 DWGS REV C This page is intentionally left blank...
Страница 36: ......
Страница 37: ......
Страница 38: ...CHANDLER ENGINEERING...
Страница 39: ......
Страница 40: ...CHANDLER ENGINEERING...
Страница 41: ......