P-2 PREFACE
Serial Interface:
Modbus-RTU
Protocol
Hydraulic Fluid:
SAE 10W30 Synthetic Oil
Shipping Dimensions:
Load
Frame
48” (122 cm) high x 24” (61 cm) wide x 28” (71 cm) deep
Control
Cabinet
54” (138 cm) high x 28” (71 cm) wide x 30” (76 cm) deep
Net Weight:
Load Frame
360 lbs (164 kg)
Control Cabinet
570 lbs (260 kg)
Safety Requirements
Note: Before attempting to operate the instrument, the operator should read and
understand this manual.
The Chandler Engineering Model 4207D Digital Compressive Strength Tester is designed for
operator safety. Any instrument that is capable of high pressures should always be operated
with
CAUTION
!!
To ensure safety:
•
Locate the instrument in a low traffic area.
•
Post signs where the instrument is being operated to warn non-operating personnel.
•
Read and understand instructions before attempting instrument operation.
•
Observe caution notes!
•
Observe and follow the warning labels on the instrument.
•
Never exceed the instrument maximum temperature ratings.
•
Always disconnect main power to the instrument before attempting any repair.
•
Appropriately rated fire extinguishers should be located within close proximity.
•
Only trained personnel should operate the system.
•
The system should never be operated while unattended.
•
All personnel using the system should wear safety glasses.
•
The system must be located in a safe environment.
•
All safety interlocks must be operational and properly adjusted.
•
The system must be properly maintained and any defective components serviced or
replaced.
Safety Features
•
Door interlock switch
: Prevents the operation of the system when the press door is open.
•
Over temperature safety circuit
: Prevents the operation of the system if the oil
temperature exceeds the specified limit.
Содержание Chandler Engineering 4207D
Страница 8: ...P 4 PREFACE This page is intentionally left blank ...
Страница 18: ...2 8 SECTION 2 OPERATING INSTRUCTIONS This page is intentionally left blank ...
Страница 24: ...3 6 SECTION 3 MAINTENANCE This page is intentionally left blank ...
Страница 28: ...5 2 SECTION 5 REPLACEMENT PARTS This page is intentionally left blank ...
Страница 30: ...6 2 SECTION 6 DRAWINGS AND SCHEMATICS This page is intentionally left blank ...
Страница 39: ...CHANDLER ENGINEERING ...
Страница 40: ......