25
Platform Closure Kit
Slide
the C
-
post over the exposed leg in the corner of the platform.
The C
-
post rail lengths are manufactured to be at the
“
standard
”
length which allows for the ramp to be
inset from the opposite side. It is just enough space
(1.5”)
to allow handrail clearance between the loop
on the ramp rail and the platform rail.
Insert
the (2) 90 degree plastic platform swivels and align them to the ramp handrails
(see diagram).
Secure
the swivels at each end with the #8 Tek screws
. Insert screws on underside out of reach of a
hand.
Install Note:
Should you need to slide the ramp
closer to the closure kit corner;
you will need to
cut the C
-
post tubes to make a proper fit
. This
is best done by using a battery powered circular
saw. A
2”
pipe cutter can also be used. Secure
the swivels at each end with the #10 Tek screws.
Install
the
20”
-
1”
x
2”
aluminum curb
on the
platform under the closure kit. If you need to cut
the curb to fit, be sure to file the ends of any sharp
edges.
CAUTION:
Make sure the curb does NOT impede
into the ramp area causing a tripping hazard.
Install
the
“
L
”
shaped rubber boots
to the edges
of the curb before securing to the platform surface.
Use the #14 Tek screws, one on each end and one
in the middle.
Closure Kit for
90
-
Degree Turn
Platform
To close the open side of a
platform with railing, you will
use the
PSCK
(Patriot Series
Closure Kit). This will allow
you to close the gap from the
corner of a platform to the
ramp rail. A description of the
kit and its contents are listed
on page 10.
Bridge plate
ULEG
Platform Leg
Loop
Curb
Rubber Boots
PSK
Curb
Содержание XM
Страница 1: ...1 Modular Ramp Installation Manual Ver 2020 0723 ...
Страница 2: ...2 ...