![Amazone AD-P 3001 Special 850 Скачать руководство пользователя страница 84](http://html1.mh-extra.com/html/amazone/ad-p-3001-special-850/ad-p-3001-special-850_operating-manual_2919700084.webp)
Layout and function
84
AD-P 30/35/4001 SPECIAL BAH0095-2 11.17
5.16.1
Examples for creating tramlines
The creation of tramlines is shown using various examples:
A = Working width of the seed drill
B = Tramline spacing
(= working width fertiliser spreader/field sprayer)
C = Tramline rhythm (entered on the control terminal)
D = Tramline counter (during operation, the field passes are numbered consecutively and displayed on
the control terminal).
Carry out inputs and displays according to the control terminal operating manual.
Example:
Working width – seed drill:
3 m
Working width – fertiliser spreader or field sprayer:
9 m = 9 m tramline spacing
1. In the adjacent table, look for the following:
in column A the seed drill's working width (3 m) and
in column B the tramline spacing (9 m).
2. On the same line column "C", read the tramline rhythm (tramline rhythm 3) and enter it on the
control terminal.
3. On the same line in column "D" under the inscription "START", take the reading of the tramline
counter for the first field pass (tramline counter 2) and enter it on the control terminal. Input this
value directly before commencing the first field run.
Содержание AD-P 3001 Special 850
Страница 9: ...AD P 30 35 4001 SPECIAL BAH0095 2 11 17 9 ...
Страница 85: ...Layout and function AD P 30 35 4001 SPECIAL BAH0095 2 11 17 85 Fig 79 ...
Страница 211: ...Hydraulic diagram AD P 30 35 4001 SPECIAL BAH0095 2 11 17 211 Fig 267 ...
Страница 212: ......
Страница 213: ......