![Amazone AD-P 3001 Special 850 Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/amazone/ad-p-3001-special-850/ad-p-3001-special-850_operating-manual_2919700027.webp)
General safety instructions
AD-P 30/35/4001 SPECIAL BAH0095-2 11.17
27
2.16
Safety information for users
WARNING
Risk of crushing, cutting, being trapped or drawn in, or impact
through inadequate roadworthiness and operational safety.
Before starting up the implement and the tractor each time, always
check their traffic and operational safety.
CAUTION
Before adjustment, maintenance and repair work
couple the pack top seed drill
and the soil tillage implement.
lower the implement onto level solid ground
apply the tractor parking brake
switch off the control terminal
switch off the tractor engine.
remove the ignition key.
disconnect the power supply between the tractor and the imple-
ment. Disconnect the implement plug (e.g. ISOBUS plug).
Risk of accident due to unintentional activation of the metering
unit or other implement components caused by wheel move-
ments or radar pulses.
2.16.1
General safety instructions and accident prevention instructions
In addition to these instructions, also comply with the generally
valid national and safety and accident prevention regulations!
The warning symbols attached on the implement provide im-
portant instructions for safe operation of the implement. Compli-
ance with these instructions is essential for your safety!
Before moving off and starting up the implement, check the im-
mediate area of the implement (children). Ensure that you can
see clearly.
It is forbidden to ride on the machine or use it as a means of
transport!
Drive in such a way that you always have full control over the tractor
with the attached implement.
In so doing, take your personal abilities into account, as well as
the road, traffic, visibility and weather conditions, the driving
characteristics of the tractor and the connected or coupled im-
plement.
Содержание AD-P 3001 Special 850
Страница 9: ...AD P 30 35 4001 SPECIAL BAH0095 2 11 17 9 ...
Страница 85: ...Layout and function AD P 30 35 4001 SPECIAL BAH0095 2 11 17 85 Fig 79 ...
Страница 211: ...Hydraulic diagram AD P 30 35 4001 SPECIAL BAH0095 2 11 17 211 Fig 267 ...
Страница 212: ......
Страница 213: ......