![Amazone AD-P 3001 Special 850 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/amazone/ad-p-3001-special-850/ad-p-3001-special-850_operating-manual_2919700006.webp)
6
AD-P 30/35/4001 SPECIAL BAH0095-2 11.17
5.3.2
Measuring the distance covered with a pulse wheel ............................................................. 54
5.4
Implement documentation ..................................................................................................... 54
5.5
Central key ............................................................................................................................ 55
5.6
Hopper and loading board ..................................................................................................... 55
5.6.1
Fill level control ...................................................................................................................... 56
5.7
Metering ................................................................................................................................ 57
5.7.1
Metering roller diagram table ................................................................................................ 59
5.7.2
Table – metering rollers, seed ............................................................................................... 62
5.7.3
Calibrating the seed rate ....................................................................................................... 64
5.7.4
Automatic seed rate increase ................................................................................................ 66
5.7.5
Spreading seed with wide row spacing ................................................................................. 66
5.7.6
Seed pre-metering................................................................................................................. 67
5.7.7
Start-up ramp ........................................................................................................................ 67
5.8
Blower fan ............................................................................................................................. 68
5.9
Distributor head ..................................................................................................................... 70
5.9.1
Seed tube monitoring ............................................................................................................ 71
5.10
WS coulter ............................................................................................................................. 72
5.10.1
Band seeding shoe................................................................................................................ 72
5.11
RoTeC Control coulter .......................................................................................................... 73
5.12
Coulter pressure, seed rate increase and coulter lifting........................................................ 74
5.12.1
Coulter pressure - Mechanical adjustment ........................................................................... 74
5.12.2
Coulter pressure - Hydraulic adjustment ............................................................................... 75
5.12.3
Lifting the coulters and harrow - soil tillage without seeding ................................................. 76
5.13
Exact following harrow .......................................................................................................... 76
5.13.1
Exact following harrow tine position ...................................................................................... 77
5.13.2
Exact following harrow pressure ........................................................................................... 78
5.14
Roller harrow with contour guidance ..................................................................................... 79
5.15
Track marker ......................................................................................................................... 80
5.16
Tramlines ............................................................................................................................... 81
5.16.1
Examples for creating tramlines ............................................................................................ 84
5.16.2
Tramline rhythms 4, 6, and 8 ................................................................................................ 86
5.16.3
Tramline rhythm 2 and 21 ..................................................................................................... 87
5.16.4
One-sided switching .............................................................................................................. 88
5.16.5
Tramline marker .................................................................................................................... 90
5.17
Work floodlights ..................................................................................................................... 91
5.18
Camera system ..................................................................................................................... 91
6
Start-up ...................................................................................................... 92
6.1
Checking the suitability of the tractor .................................................................................... 93
6.1.1
Calculating the actual values for the total tractor weight, tractor axle loads and tyre
load-bearing capacity, as well as the required minimum ballast weight ............................... 94
6.1.1.1
Data required for the calculation (attached implement) ........................................................ 95
6.1.1.2
Calculation of the required minimum ballast weight at the front G
V min
of the tractor
to ensure steering capability ................................................................................................. 96
6.1.1.3
Calculation of the actual front axle load of the tractor T
V tat
................................................... 96
6.1.1.4
Calculation of the actual total weight of the combined tractor and implement ...................... 96
6.1.1.5
Calculation of the actual rear axle load of the tractor T
H tat
................................................... 96
6.1.1.6
Load-bearing capacity of the tractor tyres ............................................................................. 96
6.1.1.7
Table ..................................................................................................................................... 97
6.2
Secure the tractor / implement against unintentional starting and rolling away ................... 98
6.3
Hydraulic connection for the blower fan drive ....................................................................... 99
7
Coupling and uncoupling the implement .............................................. 100
7.1
Hydraulic hose lines ............................................................................................................ 102
7.1.1
Coupling the hydraulic hose lines ....................................................................................... 102
7.1.2
Uncoupling the hydraulic hose lines .................................................................................... 103
7.2
Coupling implements ........................................................................................................... 104
7.2.1
Coupling of the tractor and soil tillage implement with ISOBUS system ............................. 106
Содержание AD-P 3001 Special 850
Страница 9: ...AD P 30 35 4001 SPECIAL BAH0095 2 11 17 9 ...
Страница 85: ...Layout and function AD P 30 35 4001 SPECIAL BAH0095 2 11 17 85 Fig 79 ...
Страница 211: ...Hydraulic diagram AD P 30 35 4001 SPECIAL BAH0095 2 11 17 211 Fig 267 ...
Страница 212: ......
Страница 213: ......