53
You now need to bolt the internal arms (EV1120M) onto the underside of the slats (diagram 134).
These uses the extra bolts you inserted earlier. Loosely fit the nuts for now. Before attaching the
internal arms to the longest slat you also need to attach the diagonal supports (EV0350M) to the
same bolt. Line the ends of the internal arm up with the front edge of the staging (diagram 136) and
with the outer staging arm at the rear (diagram 135), once happy with the position tighten all the
nuts. Attach the internal mid arm (EV1123) in a similar manner, diagram 134.
Important:
The extra bolt in the longest slat should be left towards the rear of the building as this is
used to connect the next section of staging (shown by the arrow in diagram 134).
Internal
Diagram 134
Dia. 135
Dia. 137
Dia. 136
Staging Installation (ends)
15
Diagram 136
EV
11
20
M
Internal
E
V
0
3
5
0
M
Using a level make sure the staging is flat
and level before fixing the diagonal
supports in place with large head 25mm
screws (diagram 137).
Diagram 137
Internal
EV
03
50
M
Diagram 135
EV
11
20
M
EV1
121
M