52
Staging Installation (ends)
15
You can now start to install the staging slats. Each slat needs 5 x 10mm bolt (HE576) sliding down
the bolt channel on the underside. Its easiest to lay the slat topside down to do this, then turn it over
to position it. The two bolts closest to the ends locate with the holes in the staging arms (diagram
132). The longest slat (EV1131M) nearest to the middle of the greenhouse needs 6 x 10mm bolts.
The ends of the slats should line up with
the staging arms, if they don’t then this
suggests the building is out of square.
Try adjusting the position of the base
until the slats line up.
EV1134M
EV1133M
EV1132M
EV1131M
Diagram 133
Internal
Diagram 131
Dia. 132
EV1134M
Internal
Diagram 132
EV1134M
Internal