29
Lantern Attachment
9
With at least two persons on ladders lift the assembled lantern top above the roof and lower it down
onto the greenhouse main frame (diagram 67). The lantern top then fixes to this with twelve 25mm pan
head screws (diagram 68).
External
Diagram 67
Diagram 68
Dia. 68