41
Glazing (part 1)
Diagram 102
With the large pane in position you can now install
the first piece of bar capping. This capping is fitted
to the glazing bar with 40mm Pan head screws and
should be as far down the glazing bar as possible,
touching the mid rail. This will leave a gap at the
top, as shown in diagram 103.
12
Before you install the large panes it helps to place each 1028mm long bar capping around the
building ready for installation. When ready, insert the large side pane next to the louvre (diagram
101). If this is difficult try loosening off the middle screws on the eaves bracket indicated by the
arrows on diagram 103. Remember to tighten all the screws after glazing the sides, but don’t over
tighten them!
Dia. 103
Diagram 101
Dia. 103
External
Diagram 103
EV400X1050
EV795X392
EV610X
76
EV795X1050
EV610X
76
EV795X1050