STAGING
Staging Assembly Alton Amateur from Summer Greenhouses
The staging can be supplied in different widths
and can be fitted to either side of the greenhouse.
fig 2
The general instructions apply to all sizes.
fig 1
see fig 2
fig 3
see fig 3
To get the staging support brackets at the correct
height hold one of the staging legs next to each
side glazing bar, with the bottom of the leg level
with the underside of the concrete base kerb.
Mark on the glazing bars (not end gables or
partitions) the level of the rebate at the top of the
leg.
This is the correct height for the horizontal part of
the support brackets on which the long side of the
staging will rest. Fix the brackets with
3/4
”/19mm
round head screws. See fig 2. Double brackets are
used for where lengths of staging meet.
Position the end bracket at the plain gable end by
the same means and fix with 1”/25mm counter
sunk screws.
See fig 3
Position the staging legs as shown in fig 1, which is
basically opposite the side panel uprights. And after
drilling pilot holes fix in place with 1”/25mm
countersunk screws.
page 25
Phone Summer Greenhouses free 7 days a week on 0800 9777 828 or visit www.SummerGreenhouses.com