background image

 

 

 

 

RIDGE BAR / ROOF PANELS 

 

 

 

 

 

Preparation and Fixing of Ridge Bar 

Fixing Roof Panels 

 

Apply the sealing mastic to the ridge, either when 

its fixed in position or now while it’s still on the  

ground. A Mastic Gun is required and the nozzle  

should be cut to provide a 

5

/

8

”/15mm bead which  

is applied to the inside top edge of the ridge bar.  

See fig 5. 

 

fig 5 

Prior to commencing the assembly of the roof 

gather  together  all  the  necessary  bolts,  washers, 

nuts, brackets and screws that you require for this 

part of the assembly. 

1”/25mm Round head screws 

3

3

/

8

”/85mm Bolts, washers and nuts 

1

1

/

4

”/32mm Countersunk screws 

2”/50mm Countersunk screws 

2

3

/

4

”/70mm Bolts, washers and nuts 

Galvanised Roof vent nails 

Plastic tongue·Eaves brackets 

The  quantity  will  vary  dependent  on  the  length  of 

the model. 

Double roof sections must be positioned above  

double  side  sections,  and  single  roof  sections  above 

single side sections. 

 

With assistance, offer the ridge bar to the 

assembly  and  fix  with  a  2

1

/

2

”/64mm  counter-sunk 

screw at each end. See fig 6. 

 
 
fig 6 

 

 

 

 

 

 

 

 

On any ridge board longer than 8’0” it is essential 

to prop it at the centre for the duration of the  

assembly. 

 

It is beneficial on the longer buildings to prop the 

ridge to the extent that it has a small upward  

curve in it. 

page 12 

see 

see 

fig 5 

fig 4 

see 

fig 2

&

First  fix  the  eaves  brackets  to  the  roof  sections.  

They  are  required  on  each  roof  section  except  

where adjacent to the gable ends. See figs 2/3. 

fig 2  

Phone Summer Greenhouses free 7 days a week on 0800 9777 828 or visit www.SummerGreenhouses.com

 

Содержание AMATEUR CEDAR GREENHOUSE 6' Wide

Страница 1: ...ustomers of Summer Greenhouses after ordering For advice before you buy phone us free 7 days a week on 0800 9777 828 or visit www SummerGreenhouses com PLEASE READ ALL INSTRUCTIONS BEFORE PROCEEDING 0...

Страница 2: ...inwater Adaptor Kit Automatic Vent Openers SITE PREPARATIONS Siting your Greenhouse Site Preparation CONCRETE BASE KERBS Base Kerb Dimensions Setting out the Concrete Kerbs FIXING TO CONCRETE KERBS Fi...

Страница 3: ...s relate to a 10 6 3 20m long Amateur Greenhouse For other models you will have a greater or smaller number of Side and Roof Sections for your chosen model Before you commence assembly of the frame it...

Страница 4: ...om for your greenhouse When siting the original greenhouse consider the space available for an extension at a later date Further Information If you require further information on any of these accessor...

Страница 5: ...row of paving slabs The depth of footings will depend on the nature of the ground on your site For practical purposes a spade s width and depth may be preferred Inside dimension replace a piece of gl...

Страница 6: ...e dimensions are given above Check the diagonal measurements both ways to ensure squareness As a result of the manufacturing process the kerbs can in some cases be uneven on the underside and may need...

Страница 7: ...ngths and are for specific locations Washers should always be fitted before the nut is put on Please note that when a low level vent is fitted adjacent to the gable end that the bolts have to be rever...

Страница 8: ...correct that the end of the side section does not line up flush with the gable end fig 5 Secure each section to the cill with a 2 50mm screw through each pre drilled hole at the bottom of the section...

Страница 9: ...e panels to the cills as before with a 2 50mm countersunk screw though each pre drilled hole as shown in fig 8 Fix the plastic tongue in the slot between the side panels This may be done from either t...

Страница 10: ...off 33 8 85 mm bolts washers and nuts through the pre drilled holes See fig 2 Fix door gable end to the cills with 2 50mm countersunk screws through each pre drilled hole If the side vent is next to...

Страница 11: ...brackets on the underside of the ridge bar Position the brackets along the ridge bar as indicated in fig 3 Measure a 1 5 432mm in from each end and b 2 65 8 778mm between each bracket Drill pilot hole...

Страница 12: ...ised Roof vent nails Plastic tongue Eaves brackets The quantity will vary dependent on the length of the model Double roof sections must be positioned above double side sections and single roof sectio...

Страница 13: ...oof vent it must now be fitted Position the roof vent centrally and secure with 3 off 2 50mm countersunk screws through the pre drilled holes See Fig 5 Offer up the first roof panel Align with holes i...

Страница 14: ...sliding back out and you may find it easier to accomplish this by gripping the folded end with a pair of pliers Note It is correct that the end of the roof section does not line up flush with the gab...

Страница 15: ...ls use 5 per strip See fig 2 Fix the remaining roof cover strips as shown opposite in fig 3 If you have a roof vent adjacent to the gable you will have to cut away part of the strip to allow the fig 4...

Страница 16: ...3 BUILDINGS 10 3 05m AND LONGER Fix the ridge braces to every glazing bar except at the gable ends These are 2 610mm in length and should be positioned centrally and secured with 4 off 11 4 32mm coun...

Страница 17: ...at the gable ends Fix middle brace at the top and bottom with 11 2 38mm countersunk screws to the roof and side cill in the pre drilled holes The base of the middle brace is shaped to partially fit ov...

Страница 18: ...is vertical and then hold the metal top door track in position and mark its location on the frame Take the door away and fit the metal top door track Ensure the right hand end lines up with the outsid...

Страница 19: ...3 4 19mm countersunk screws See fig 6 7 Position the metal door stay as shown in fig 8 so that when the door is closed it lines up with and covers the fig 6 end of the channel cut into the door Fix wi...

Страница 20: ...ey are in the correct position fix with 3 4 19mm countersunk screws We do not supply a casement stay when an Automatic Opener is supplied To fix an Automatic Opener refer to fig 4 plus the fig 5 separ...

Страница 21: ...Louvre Bottom location rail channel Bottom louvre cill Rail fixing screw fig 1 location bending lips up Use pliers if necessary 19mm R H screws Sides only Plastic seal cut flush at ends 5mm Self tap s...

Страница 22: ...to place with the downpipe connected Using a 3 4 19mm screw See fig 4 Fix the support brackets fig 3 and joint bracket s fig 5 as required for the length of greenhouse Use 3 4 19mm screws Working from...

Страница 23: ...re joined See fig3 Place the shelf on the brackets and position the shelf strap After drilling pilot holes fix the bottom fig 2 Measure down 131 2 345mm 3 4 19mm roundhead screw Shelf Bracket fig 3 of...

Страница 24: ...the shelf in position and mark the length centre of both the brace and double bracket With a spirit level ensure the shelf is level Offer up the support bracket and secure with two 3 4 19mm No 8 csk...

Страница 25: ...titions the level of the rebate at the top of the leg This is the correct height for the horizontal part of the support brackets on which the long side of the staging will rest Fix the brackets with 3...

Страница 26: ...emove one slat from each length of staging to accommodate these braces It may also be necessary to trim one of the staging sections to get a correct fit if a partition is installed Always check for le...

Страница 27: ...are fixed with screws Side and End glass All glass is held in on one side by a glazing groove and on the other by a timber beading and plastic glass stops at the bottom The timber beading can be prise...

Страница 28: ...oduced You are advised to refer to the instructions supplied with the product before assembly If for any reason the instructions are not delivered with the product you are advised to obtain the most r...

Отзывы: