background image

 

 

 

 

LOUVRE VENTS 

 

 

 

 

 

Louvre Vent Assembly and Fitting 

 

Louvre vents are fitted at staging height and are 

position, pushing 

positioned to complement other ventilation 

gently upwards to 

available: eg ventaccess and roof vents. 

ensure a good fit 

They can only be fitted where the glass you 

and make secure 

are replacing is 730 x 1422mm. 

with brown glass 

stops and replacing 

First, carefully remove existing sheet of glass from 

the glazing beading. 

the chosen panel by removing the glazing 

See fig.4. 

beading and the two brown glass stops. Support 

the glass at the bottom, then gently remove the 

Finally open louvre 

glass by initially moving to the left.  Put safely to 

to the horizontal 

one side. Remove centre nut and bolt from side 

position and insert 

section. 

glass blades, (4mm 

thick). Secure by 

 

 

 

 

 

 

OPTIONAL 

 

 

 

fig 2 

 

21” / 535mm 

 
 
 
 

Top 
louvre 

Top rail 

cill 

channel 

Louvre 

Bottom 

location 

rail 
channel 

Bottom 
louvre 
cill  

Rail fixing screw 

fig 1 

location 

bending lips up. 
(Use pliers if 

necessary). 

 

19mm 
R/H screws. 
Sides only 

Plastic seal, cut flush at 
ends 

 
 
 

5mm Self tap screws. 
Top and bottom only 

The fitting of 

automatic 

openers  

can  be  done  at  this  

stage.  Please  follow  

the  instructions  that  

come with the unit. 

SECTION 

fig 4  

 

from outside the greenhouse  

Measure 21”/535mm for top of panel. 

See fig 2. 

Insert  the  louvre  top  rail  into  the  top  cill  

channel  until  fully  home.  Together  with  

the top sheet of glass (18

1

/

2

” x 28

1

/

4

” / 

470  x  730mm)  offer  up  to  the  section  so  

that  the  bottom  of  the  top  louvre  cill  is  at  

21”/535mm.  See  fig  3.  At  this  stage  mark  

screw  locations  of  vent,  make  pilot  holes  

with bradawl/drill. Secure with 

3

/

4

” / 

19mm roundhead screws provided. 
 

Fit bottom cill onto the louvre vent 

bottom rail. Place bottom sheet of glass in 

fig 3 

from inside the greenhouse 

replace beading once 
vent is fitted 

page 21  

Phone Summer Greenhouses free 7 days a week on 0800 9777 828 or visit www.SummerGreenhouses.com

 

Содержание AMATEUR CEDAR GREENHOUSE 6' Wide

Страница 1: ...ustomers of Summer Greenhouses after ordering For advice before you buy phone us free 7 days a week on 0800 9777 828 or visit www SummerGreenhouses com PLEASE READ ALL INSTRUCTIONS BEFORE PROCEEDING 0...

Страница 2: ...inwater Adaptor Kit Automatic Vent Openers SITE PREPARATIONS Siting your Greenhouse Site Preparation CONCRETE BASE KERBS Base Kerb Dimensions Setting out the Concrete Kerbs FIXING TO CONCRETE KERBS Fi...

Страница 3: ...s relate to a 10 6 3 20m long Amateur Greenhouse For other models you will have a greater or smaller number of Side and Roof Sections for your chosen model Before you commence assembly of the frame it...

Страница 4: ...om for your greenhouse When siting the original greenhouse consider the space available for an extension at a later date Further Information If you require further information on any of these accessor...

Страница 5: ...row of paving slabs The depth of footings will depend on the nature of the ground on your site For practical purposes a spade s width and depth may be preferred Inside dimension replace a piece of gl...

Страница 6: ...e dimensions are given above Check the diagonal measurements both ways to ensure squareness As a result of the manufacturing process the kerbs can in some cases be uneven on the underside and may need...

Страница 7: ...ngths and are for specific locations Washers should always be fitted before the nut is put on Please note that when a low level vent is fitted adjacent to the gable end that the bolts have to be rever...

Страница 8: ...correct that the end of the side section does not line up flush with the gable end fig 5 Secure each section to the cill with a 2 50mm screw through each pre drilled hole at the bottom of the section...

Страница 9: ...e panels to the cills as before with a 2 50mm countersunk screw though each pre drilled hole as shown in fig 8 Fix the plastic tongue in the slot between the side panels This may be done from either t...

Страница 10: ...off 33 8 85 mm bolts washers and nuts through the pre drilled holes See fig 2 Fix door gable end to the cills with 2 50mm countersunk screws through each pre drilled hole If the side vent is next to...

Страница 11: ...brackets on the underside of the ridge bar Position the brackets along the ridge bar as indicated in fig 3 Measure a 1 5 432mm in from each end and b 2 65 8 778mm between each bracket Drill pilot hole...

Страница 12: ...ised Roof vent nails Plastic tongue Eaves brackets The quantity will vary dependent on the length of the model Double roof sections must be positioned above double side sections and single roof sectio...

Страница 13: ...oof vent it must now be fitted Position the roof vent centrally and secure with 3 off 2 50mm countersunk screws through the pre drilled holes See Fig 5 Offer up the first roof panel Align with holes i...

Страница 14: ...sliding back out and you may find it easier to accomplish this by gripping the folded end with a pair of pliers Note It is correct that the end of the roof section does not line up flush with the gab...

Страница 15: ...ls use 5 per strip See fig 2 Fix the remaining roof cover strips as shown opposite in fig 3 If you have a roof vent adjacent to the gable you will have to cut away part of the strip to allow the fig 4...

Страница 16: ...3 BUILDINGS 10 3 05m AND LONGER Fix the ridge braces to every glazing bar except at the gable ends These are 2 610mm in length and should be positioned centrally and secured with 4 off 11 4 32mm coun...

Страница 17: ...at the gable ends Fix middle brace at the top and bottom with 11 2 38mm countersunk screws to the roof and side cill in the pre drilled holes The base of the middle brace is shaped to partially fit ov...

Страница 18: ...is vertical and then hold the metal top door track in position and mark its location on the frame Take the door away and fit the metal top door track Ensure the right hand end lines up with the outsid...

Страница 19: ...3 4 19mm countersunk screws See fig 6 7 Position the metal door stay as shown in fig 8 so that when the door is closed it lines up with and covers the fig 6 end of the channel cut into the door Fix wi...

Страница 20: ...ey are in the correct position fix with 3 4 19mm countersunk screws We do not supply a casement stay when an Automatic Opener is supplied To fix an Automatic Opener refer to fig 4 plus the fig 5 separ...

Страница 21: ...Louvre Bottom location rail channel Bottom louvre cill Rail fixing screw fig 1 location bending lips up Use pliers if necessary 19mm R H screws Sides only Plastic seal cut flush at ends 5mm Self tap s...

Страница 22: ...to place with the downpipe connected Using a 3 4 19mm screw See fig 4 Fix the support brackets fig 3 and joint bracket s fig 5 as required for the length of greenhouse Use 3 4 19mm screws Working from...

Страница 23: ...re joined See fig3 Place the shelf on the brackets and position the shelf strap After drilling pilot holes fix the bottom fig 2 Measure down 131 2 345mm 3 4 19mm roundhead screw Shelf Bracket fig 3 of...

Страница 24: ...the shelf in position and mark the length centre of both the brace and double bracket With a spirit level ensure the shelf is level Offer up the support bracket and secure with two 3 4 19mm No 8 csk...

Страница 25: ...titions the level of the rebate at the top of the leg This is the correct height for the horizontal part of the support brackets on which the long side of the staging will rest Fix the brackets with 3...

Страница 26: ...emove one slat from each length of staging to accommodate these braces It may also be necessary to trim one of the staging sections to get a correct fit if a partition is installed Always check for le...

Страница 27: ...are fixed with screws Side and End glass All glass is held in on one side by a glazing groove and on the other by a timber beading and plastic glass stops at the bottom The timber beading can be prise...

Страница 28: ...oduced You are advised to refer to the instructions supplied with the product before assembly If for any reason the instructions are not delivered with the product you are advised to obtain the most r...

Отзывы: