
Testing Call Router
20-28
AltiWare OE System Installation & Administration Manual
To test Call Router:
1.
With Call Router function stopped, go to Test in the Tool drop-down
list of the Call Router main menu for the Test dialog box.
2.
In the Configuration fields, the user can input the following test
parameters:
• Number of concurrent calls
• Interval between calls
• Number of test cycles
For example, inputting 5 for concurrent calls, 3 for interval between
calls, and 4 for test cycles means that every 3 seconds, there will be 5
concurrent call requests to Call Router. Total cycles of concurrent
requests will be 4 times.
3.
After inputting the test parameters, click Start. During the test, the
user can click Stop to stop the test. The title of the Test dialog box will
be shown as “Test(Started)” while running.
Содержание AltiWare OE 4.6
Страница 1: ...AltiWare OE Version 4 6 System Installation and Administration Manual Revised 06 2003 4403 0001 4 6 ...
Страница 64: ...Key AltiServ Characteristics 1 30 AltiWare OE System Installation Administration Manual ...
Страница 144: ...Stopping the AltiGen Switching Service 4 12 AltiWare OE System Installation Administration Manual ...
Страница 248: ...Outgoing Call Blocking 7 22 AltiWare OE System Installation Administration Manual ...
Страница 324: ...Phrase Management 10 14 AltiWare OE System Installation Administration Manual ...
Страница 330: ...Feature Tips 11 6 AltiWare OE System Installation Administration Manual ...
Страница 380: ...Changing TAPI Configuration Parameters 15 4 AltiWare OE System Installation Administration Manual ...
Страница 386: ...Configuration 16 6 AltiWare OE System Installation Administration Manual ...
Страница 414: ...AltiWeb Security 18 24 AltiWare OE System Installation Administration Manual ...
Страница 424: ...DINA Manager 19 10 AltiWare OE System Installation Administration Manual ...
Страница 502: ...G 12 AltiWare OE System Installation Administration Manual ...