AltiWare ACM 5.2 Administration Manual 387
A
P P E N D I X
A
E1-R2 and E1 ISDN PRI Installations
E1 R2 CAS Installation
This section describes the configuration procedures necessary to implement E1 R2 digital
signaling for European, Pacific Rim, and other emerging markets. Please carefully follow
the procedures step by step.
1. Change the
Configure Type
to
E1
:
a. From
Boards
view, double-click the board to be configured to open the Board
Configuration window.
b. In the Board Configuration window, click the
Board Configuration
button.
c.
In the next Board Configuration window, select
E1
as the configure type, and
click
OK
.
Important:
When changing from E1 to T1, then back to E1, trunk channel properties and
channel group properties will be reset to default values. It is important to
make sure the trunk channel properties are configured properly. Continue to
follow the steps below to re-check your settings for the physical layer, data
link layer and signaling layer.
Содержание AltiWare ACM 5.2
Страница 1: ...AltiWare ACM 5 2 Administration Manual 10 2008 4413 0001 5 2...
Страница 14: ...2 AltiWare ACM 5 2 Administration Manual...
Страница 38: ...Chapter 2 AltiWare Requirements 26 AltiWare ACM 5 2 Administration Manual...
Страница 84: ...Chapter 5 Gateway Management 72 AltiWare ACM 5 2 Administration Manual...
Страница 90: ...Chapter 6 Voice Mail Configuration 78 AltiWare ACM 5 2 Administration Manual...
Страница 116: ...Chapter 9 Call Recording Configuration 104 AltiWare ACM 5 2 Administration Manual...
Страница 120: ...Chapter 10 Application Extension Configuration 108 AltiWare ACM 5 2 Administration Manual...
Страница 144: ...Chapter 11 Board Configuration 132 AltiWare ACM 5 2 Administration Manual...
Страница 172: ...Chapter 12 Trunk Configuration 160 AltiWare ACM 5 2 Administration Manual...
Страница 178: ...Chapter 13 In Call Routing Configuration 166 AltiWare ACM 5 2 Administration Manual...
Страница 190: ...Chapter 14 Out Call Routing Configuration 178 AltiWare ACM 5 2 Administration Manual...
Страница 222: ...Chapter 15 Extension Configuration 210 AltiWare ACM 5 2 Administration Manual...
Страница 230: ...Chapter 16 Setting Up IP Extensions 218 AltiWare ACM 5 2 Administration Manual...
Страница 246: ...Chapter 18 Mobile Extension Configuration 234 AltiWare ACM 5 2 Administration Manual...
Страница 264: ...Chapter 20 Paging Group Configuration 252 AltiWare ACM 5 2 Administration Manual...
Страница 268: ...Chapter 21 Line Park Configuration 256 AltiWare ACM 5 2 Administration Manual...
Страница 304: ...Chapter 22 Workgroup Configuration 292 AltiWare ACM 5 2 Administration Manual...
Страница 314: ...Chapter 23 Managing and Using MeetMe Conference 302 AltiWare ACM 5 2 Administration Manual...
Страница 322: ...Chapter 24 Network Configuration Guidelines for VoIP 310 AltiWare ACM 5 2 Administration Manual...
Страница 358: ...Chapter 26 System Report Management 346 AltiWare ACM 5 2 Administration Manual...
Страница 382: ...Chapter 28 TAPI Integration 370 AltiWare ACM 5 2 Administration Manual...
Страница 398: ...Chapter 29 Tools and Applications 386 AltiWare ACM 5 2 Administration Manual...
Страница 422: ...chapnum 410 AltiWare ACM 5 2 Administration Manual...
Страница 426: ...chapnum 414 AltiWare ACM 5 2 Administration Manual...