RA33x Environmental Conditions
Operating temperature range
-
40 … +55 °C
Maximum operating altitude
2000 m (6560 ft)
Relative humidity
5 … 95 % noncondensing
Tested as per 60068-2-1
-40°C
Tested as per 60068-2-2
+85°C
3.11
TYPE TESTS RA33X
EMC tests were performed according to IEC 60255-26 referring to the following standards
Type Tests RA33x
IEC 61000-4-2:2008
8kV contact / 15KV air (level 4)
IEC 61000-4-3:2006
10 V/m
IEC 61000-4-4:2012
2 KV @ 5KHz (level 3)
IEC 61000-4-5:2005
Differential mode: 1KV
Common mode: 2KV
(level 3)
IEC 61000-4-6:2008
10V
IEC 61000-4-8:2009
30A/m continuos - 300A/m @ 1s.
IEC 61000-4-11:2004
IEC 61000-4-29:2000
A.C. and d.c. voltage dips
Test level: 0% residual voltage
Duration time
a.c.: 1 cycle
d.c.: 16,6ms
Test level: 40% residual voltage
Duration time
a.c.: 12 cycles
Содержание Reason RPV311
Страница 2: ......
Страница 15: ...INTRODUCTION CHAPTER 1...
Страница 34: ...SAFETY INFORMATION CHAPTER 2...
Страница 45: ...HARDWARE DESIGN CHAPTER 3...
Страница 56: ......
Страница 57: ...CONFIGURATION CHAPTER 4...
Страница 75: ...RPV311 Chapter 4 Configuration RPV311 TM EN 6 75 Figure 21 Email Fax configuration...
Страница 77: ...RPV311 Chapter 4 Configuration RPV311 TM EN 6 77 Figure 22 Adding and editing voltage circuits...
Страница 117: ...OPERATION CHAPTER 5...
Страница 121: ...RPV311 Chapter 5 Operation RPV311 TM EN 6 121 Figure 46 Status monitoring sequence...
Страница 123: ...RPV311 Chapter 5 Operation RPV311 TM EN 6 123 Figure 47 Monitoring sequence...
Страница 126: ...Chapter 5 Operation RPV311 126 RPV311 TM EN 6 Figure 49 Records monitoring sequence harmonics flicker and SOE...
Страница 128: ...Chapter 5 Operation RPV311 128 RPV311 TM EN 6 Figure 50 Equipment settings monitoring sequence...
Страница 129: ...RPV311 Chapter 5 Operation RPV311 TM EN 6 129 Figure 51 Circuit and channel settings monitoring sequence...
Страница 130: ...Chapter 5 Operation RPV311 130 RPV311 TM EN 6 Figure 52 Relays PMU and MODBUS settings monitoring sequence...
Страница 132: ...Chapter 5 Operation RPV311 132 RPV311 TM EN 6 Figure 53 General information monitoring sequence...
Страница 155: ...RECORDS CHAPTER 6...
Страница 172: ......
Страница 173: ...TW FAULT LOCATOR CHAPTER 7...
Страница 183: ...PMU CHAPTER 8...
Страница 189: ...MODBUS CHAPTER 9...
Страница 193: ...DNP3 CHAPTER 10...
Страница 196: ......
Страница 197: ...GOOSE MESSAGE DETECTION CHAPTER 11...
Страница 200: ......
Страница 201: ...SOFTWARE RPV TOOLS CHAPTER 12...
Страница 228: ......
Страница 229: ...SOFTWARE RPV MANAGER CHAPTER 13...
Страница 249: ...COMMUNICATIONS CHAPTER 14...
Страница 261: ...INSTALLATION CHAPTER 15...
Страница 295: ...Chapter 15 Installation RPV311 RPV311 TM EN 6 295 Figure 138 RA331 RA332 and RA333 dimensions...
Страница 299: ...MAINTENANCE AND TROUBLESHOOTING CHAPTER 16...
Страница 310: ...TECHNICAL SPECIFICATIONS CHAPTER 17...
Страница 329: ...Chapter 17 Technical Specifications RPV311 RPV311 TM EN 6 329 Figure 142 RA331 RA332 and RA333 dimensions...
Страница 331: ...RPV311 Chapter 17 Wiring Diagrams WIRING DIAGRAMS CHAPTER 18...
Страница 340: ...APPENDIX A...