Chapter 5
– Operation
RPV311
144
RPV311-TM-EN-6
Time stamp:
indicates the date and time of event log (yyyymm-dd hh:mm:ss[.uuuuuu]
±
0000 (UTC
time offset);
Cause:
indicates threshold exceeded;
Duration:
record length in seconds.
F
The <C
OMTRADE
> button allows download of record, line per line, and saving it in the Comtrade format,
and compression as .zic file.
G
The <C
LOSE
> button allows user to close the section.
3.6.4
SOE
The SOE recorder screen, shown in
displays a history of equipment SOE records.
Figure 63: SOE recorder screen
A
The Search box allows user to choose the period of time of the oldest to the latest to display.
B
The Manual Filter box allows user to filter the records manually, according to their selection.
C
The <L
IST
> button allows user to show the list of records according to the filtering parameters. If clicking
<L
IST
> finds no record available, a window will be opened with a message: "No records available´´. So click
<O
K
> and return to the previous section.
Содержание Reason RPV311
Страница 2: ......
Страница 15: ...INTRODUCTION CHAPTER 1...
Страница 34: ...SAFETY INFORMATION CHAPTER 2...
Страница 45: ...HARDWARE DESIGN CHAPTER 3...
Страница 56: ......
Страница 57: ...CONFIGURATION CHAPTER 4...
Страница 75: ...RPV311 Chapter 4 Configuration RPV311 TM EN 6 75 Figure 21 Email Fax configuration...
Страница 77: ...RPV311 Chapter 4 Configuration RPV311 TM EN 6 77 Figure 22 Adding and editing voltage circuits...
Страница 117: ...OPERATION CHAPTER 5...
Страница 121: ...RPV311 Chapter 5 Operation RPV311 TM EN 6 121 Figure 46 Status monitoring sequence...
Страница 123: ...RPV311 Chapter 5 Operation RPV311 TM EN 6 123 Figure 47 Monitoring sequence...
Страница 126: ...Chapter 5 Operation RPV311 126 RPV311 TM EN 6 Figure 49 Records monitoring sequence harmonics flicker and SOE...
Страница 128: ...Chapter 5 Operation RPV311 128 RPV311 TM EN 6 Figure 50 Equipment settings monitoring sequence...
Страница 129: ...RPV311 Chapter 5 Operation RPV311 TM EN 6 129 Figure 51 Circuit and channel settings monitoring sequence...
Страница 130: ...Chapter 5 Operation RPV311 130 RPV311 TM EN 6 Figure 52 Relays PMU and MODBUS settings monitoring sequence...
Страница 132: ...Chapter 5 Operation RPV311 132 RPV311 TM EN 6 Figure 53 General information monitoring sequence...
Страница 155: ...RECORDS CHAPTER 6...
Страница 172: ......
Страница 173: ...TW FAULT LOCATOR CHAPTER 7...
Страница 183: ...PMU CHAPTER 8...
Страница 189: ...MODBUS CHAPTER 9...
Страница 193: ...DNP3 CHAPTER 10...
Страница 196: ......
Страница 197: ...GOOSE MESSAGE DETECTION CHAPTER 11...
Страница 200: ......
Страница 201: ...SOFTWARE RPV TOOLS CHAPTER 12...
Страница 228: ......
Страница 229: ...SOFTWARE RPV MANAGER CHAPTER 13...
Страница 249: ...COMMUNICATIONS CHAPTER 14...
Страница 261: ...INSTALLATION CHAPTER 15...
Страница 295: ...Chapter 15 Installation RPV311 RPV311 TM EN 6 295 Figure 138 RA331 RA332 and RA333 dimensions...
Страница 299: ...MAINTENANCE AND TROUBLESHOOTING CHAPTER 16...
Страница 310: ...TECHNICAL SPECIFICATIONS CHAPTER 17...
Страница 329: ...Chapter 17 Technical Specifications RPV311 RPV311 TM EN 6 329 Figure 142 RA331 RA332 and RA333 dimensions...
Страница 331: ...RPV311 Chapter 17 Wiring Diagrams WIRING DIAGRAMS CHAPTER 18...
Страница 340: ...APPENDIX A...