Chapter 4
– Configuration
RPV311
94
RPV311-TM-EN-6
10
FAULT RECORDER
The RPV311 allows user to register triggered and continuous fault recorder.
10.1
TRIGGER’D RECORDING
, it is possible to configure the equipment's fault triggered recorder.
Figure 31: Fault recorder
– triggered recording configuration section
A
The E
NABLED
check box allows user to enable the fault recorder feature.
B
The P
RE
TIME
text field allows user to enter the recording time before the event in seconds. The P
OST
TIME
text field allows user to enter the recording time after the event in seconds. The T
IME
OUT
text field allows
user to enter the maximum time in seconds, where the event will be recorded. The D
ISABLED
FOR
–
MINUTES
IF
MORE
THAN
–
TRIGGERS
IN
THE
LAST
–
SECONDS
allows user to disable recorder if the event repeats within a
programmed time period.
Содержание Reason RPV311
Страница 2: ......
Страница 15: ...INTRODUCTION CHAPTER 1...
Страница 34: ...SAFETY INFORMATION CHAPTER 2...
Страница 45: ...HARDWARE DESIGN CHAPTER 3...
Страница 56: ......
Страница 57: ...CONFIGURATION CHAPTER 4...
Страница 75: ...RPV311 Chapter 4 Configuration RPV311 TM EN 6 75 Figure 21 Email Fax configuration...
Страница 77: ...RPV311 Chapter 4 Configuration RPV311 TM EN 6 77 Figure 22 Adding and editing voltage circuits...
Страница 117: ...OPERATION CHAPTER 5...
Страница 121: ...RPV311 Chapter 5 Operation RPV311 TM EN 6 121 Figure 46 Status monitoring sequence...
Страница 123: ...RPV311 Chapter 5 Operation RPV311 TM EN 6 123 Figure 47 Monitoring sequence...
Страница 126: ...Chapter 5 Operation RPV311 126 RPV311 TM EN 6 Figure 49 Records monitoring sequence harmonics flicker and SOE...
Страница 128: ...Chapter 5 Operation RPV311 128 RPV311 TM EN 6 Figure 50 Equipment settings monitoring sequence...
Страница 129: ...RPV311 Chapter 5 Operation RPV311 TM EN 6 129 Figure 51 Circuit and channel settings monitoring sequence...
Страница 130: ...Chapter 5 Operation RPV311 130 RPV311 TM EN 6 Figure 52 Relays PMU and MODBUS settings monitoring sequence...
Страница 132: ...Chapter 5 Operation RPV311 132 RPV311 TM EN 6 Figure 53 General information monitoring sequence...
Страница 155: ...RECORDS CHAPTER 6...
Страница 172: ......
Страница 173: ...TW FAULT LOCATOR CHAPTER 7...
Страница 183: ...PMU CHAPTER 8...
Страница 189: ...MODBUS CHAPTER 9...
Страница 193: ...DNP3 CHAPTER 10...
Страница 196: ......
Страница 197: ...GOOSE MESSAGE DETECTION CHAPTER 11...
Страница 200: ......
Страница 201: ...SOFTWARE RPV TOOLS CHAPTER 12...
Страница 228: ......
Страница 229: ...SOFTWARE RPV MANAGER CHAPTER 13...
Страница 249: ...COMMUNICATIONS CHAPTER 14...
Страница 261: ...INSTALLATION CHAPTER 15...
Страница 295: ...Chapter 15 Installation RPV311 RPV311 TM EN 6 295 Figure 138 RA331 RA332 and RA333 dimensions...
Страница 299: ...MAINTENANCE AND TROUBLESHOOTING CHAPTER 16...
Страница 310: ...TECHNICAL SPECIFICATIONS CHAPTER 17...
Страница 329: ...Chapter 17 Technical Specifications RPV311 RPV311 TM EN 6 329 Figure 142 RA331 RA332 and RA333 dimensions...
Страница 331: ...RPV311 Chapter 17 Wiring Diagrams WIRING DIAGRAMS CHAPTER 18...
Страница 340: ...APPENDIX A...