20
Alpha CD18S/24S/30S - Commissioning
5.8
USER INFORMATION
The User must be advised (and demonstrated if necessary) of the following important points:-
1.
How to light and turn off the boiler and how to operate the system controls.
2.
The importance of annual servicing of the boiler to ensure safe and efficient operation.
3.
That any servicing or replacement of parts must only be carried out by CORGI registered personnel.
4.
Ensure that the boiler controls and room thermostat (if fitted) are set to the User's requirements.
5.
Tell the User about the sealed system pressure.
6.
Tell the User that if the electrical supply is on and the boiler has not operated for 24 hours for heating or hot water, the
pump will automatically operate for 5 minutes.
7.
Explain to the User that an internal frost thermostat is fitted in the boiler, and that the electrical supply to the boiler must be
left on for the thermostat to operate.
8.
Explain to the User that in certain weather conditions the terminal will emit a plume of steam, i.e. water vapour. This is safe
and quite normal.
9.
Show the User the position of the pressure relief valve and condensate discharge pipes.
10. Hand the User's instructions to the User.
11. Ensure the Benchmark Checklist in Section 12 on page 35 has been completed after the boiler has been installed and
commissioned.
12. Leave these Installation and Servicing instructions with the User for use on future calls.
Содержание Alpha CD18S
Страница 11: ...11 Alpha CD18S 24S 30S General Boiler Information Fig 9 External soakaway Fig 8 External gully ...
Страница 29: ...29 9 1 ILLUSTRATED WIRING DIAGRAM Alpha CD18S 24S 30S Wiring Diagrams 9 WIRING DIAGRAMS ...
Страница 30: ...30 Alpha CD18S 24S 30S Wiring Diagrams 9 2 FUNCTIONAL FLOW WIRING DIAGRAM ...
Страница 32: ...32 10 2 FAULT FINDING SOLUTIONS A to E Alpha CD18S 24S 30S Fault Finding ...
Страница 33: ...33 Alpha CD18S 24S 30S Fault Finding 10 3 FAULT FINDING SOLUTIONS F to K ...