2
Alpha CD18S/24S/30S - Contents/Introduction
CONTENTS
1
Introduction ....................................... 2
2
Technical data ................................... 3
3
General boiler information .................. 6
4
Installation ......................................... 12
5
Commissioning ................................. 18
6
Boiler operation ................................. 21
7
Routine servicing ............................... 22
8
Component replacement ................... 24
9
Wiring diagrams ................................ 29
10 Fault finding ...................................... 31
11 Short parts list ................................... 34
12 Benchmark Checklist ......................... 35
13 Service record ................................... 36
The Alpha CD18S, 24S and 30S are high efficiency condensing, wall mounted, fan assisted, room-sealed system boilers. The
burner is lit electronically and the heat output is controlled by a modulating fan and gas valve.
These are system boilers providing heating only for sealed central heating systems.
The boiler is supplied with a pump, pressure relief valve, expansion vessel and pressure gauge fully assembled and tested.
The boiler provides central heating, and is designed for use with a fully pumped, sealed and pressurised central heating
system using only Natural gas.
The CD18S boiler is suitable for central heating loads of between 4.7 and 19.5 kW (16 050 and 66 500 Btu/h).
The CD24S boiler is suitable for central heating loads of between 4.7 and 25.4 kW (16 050 and 86 700 Btu/h).
The CD30S boiler is suitable for central heating loads of between 6.5 and 29.8 kW (22 200 and 101 700 Btu/h).
IMPORTANT
It is the law that all gas appliances are installed by a competent person, ie CORGI registered personnel, in accordance with
the following recommendations:-
Current Gas Safety (Installation and Use) Regulations
All current Building Regulations issued by the Department of the Environment, i.e. Approved Document L1.
Building Standards (Scotland) (Consolidation) Regulations issued by the Scottish Development Department
Health & Safety Document No. 635 (The Electricity At Work Regulations 1989)
The installation should also be in accordance with the following British Standard Codes of Practice:-
BS 5440:1:2000
Flues
BS 5449:1990
Forced circulation hot water systems
BS 5546:2000
Installation of hot water supplies for domestic purposes
BS 6700:1997
Design, installation, testing and maintenance of services supplying water
BS 6798:2000
Installation of gas fired hot water boilers
BS 6891:1998
Gas installation
BS 7593:1992
Code of Practice for treatment of water in heating systems
BS 7671:2001
Requirements for electrical installations, IEE Wiring Regulations
Reference should be made to DEFRA document 'Guide to condensing boiler installation assessment procedures for
dwellings'.
If installation is in a timber framed building, refer to the Institute of Gas Engineers document IGE/UP/7.
This appliance meets the requirements of IPX4D, ie degree of protection against moisture.
Failure to install this appliance correctly could lead to prosecution. It is in your own interest and that of safety to ensure that the
law is complied with.
Manufacturer's instructions must
NOT
be taken in anyway as over-riding statutory obligations.
Notes:
1. Ensure that the Benchmark Checklist has been completed after the boiler has been installed and commissioned.
2. The boiler
must only
be used with Alpha CD condensing flue components.
1
INTRODUCTION
Содержание Alpha CD18S
Страница 11: ...11 Alpha CD18S 24S 30S General Boiler Information Fig 9 External soakaway Fig 8 External gully ...
Страница 29: ...29 9 1 ILLUSTRATED WIRING DIAGRAM Alpha CD18S 24S 30S Wiring Diagrams 9 WIRING DIAGRAMS ...
Страница 30: ...30 Alpha CD18S 24S 30S Wiring Diagrams 9 2 FUNCTIONAL FLOW WIRING DIAGRAM ...
Страница 32: ...32 10 2 FAULT FINDING SOLUTIONS A to E Alpha CD18S 24S 30S Fault Finding ...
Страница 33: ...33 Alpha CD18S 24S 30S Fault Finding 10 3 FAULT FINDING SOLUTIONS F to K ...