SEED-DRILLSSEMINATRICE PNEUMATICA JET-M
Old Cod.Q00A00168
New Cod. MANT2018/00060 R.2
INSTALLATION
- 15
Copyright ©2009 della Alpego srl ® -Tutti i diritti sono riservati. È espressamente vie
tata la ristampa o l’uso non autorizzato per iscritto da parte di Alpego srl
4.3.3. PLATFORM ADJUSTMENT
According to the machine configuration, position the platform correctly respecting the length L2 as indicated in the
table.
POWER HARROWS
ROLLER
L2
BF
PK3
356.5
RM
PK3
296.5
RM / RK
PK5
176.5
RK
PK6
176.5
RMAX
PK5
176.5
4.4. CONNECTING THE SEED-DRILL BAR 400
The operation should be carried out on a horizontal surface, with the harrow in a stable position and the
seeding bar positioning legs inserted.
4.4.1. INSTALLING QUICK HOOKS
In order to mount the seed-bar JET-M on a machine for soil preparation you
simply have to assemble the quick hooks
A
, supplied standard with the seeding
bar, on the rear roller.
In order to do this follow these instructions
:
1. Remove the quick hooks
A
from the parallelograms by loosening
the screws
B
2. Fasten the hooks
A
on the rear roller by observing the mounting
position of the parallelograms mounted on the seed-bar