SEED-DRILLSSEMINATRICE PNEUMATICA JET-M
Old Cod.Q00A00168
New Cod. MANT2018/00060 R.2
INSTALLATION
- 10
Copyright ©2009 della Alpego srl ® -Tutti i diritti sono riservati. È espressamente vie
tata la ristampa o l’uso non autorizzato per iscritto da parte di Alpego srl
4.3. LINKAGE OF SEEDING BAR 300-350
4.3.1.
INSTALLATION OF “FAST” CONFIGURATION
The operation must be carried out on a horizontal plane, with the power harrow in a stable position and the
supporting legs of the seeding bar inserted.
Follow the following steps:
1. Assemble the telescopic arms G in the correct position according to the machine configuration (figure 3)
POWER
HARROWS
ROLLER
POSITION
LENGHT (L1)
HOLES
BF
PK3
6-7
778
C1
RM
PK3
4-5
885
C2
RM / RK
PK5
2-4
961
C3
RK
PK6
1-3
1001
C4
2. Assemble the arms
G
just assembled in the holes
A
of the seed-drill (figure 4)
3. Fix the tie rods
T1
in the holes
B
of the seed-drill, paying attention to position
C
(figure 4 and 5) of the upper hole
according to the machine configuration
4. Fix the tie rod
T2
in the correct holes according to the machine configuration (figure 3)
POWER
HARROWS
ROLLER
POSITION
BF
PK3
D1/D2
RM
PK3
D1/D2
RM / RK
PK5
D3/D4
RK
PK6
D3/D4
5. Combine the two telescopic arms through the frame
H
(figure 4)
6. Prepare for the seeding bar assembly operation