FORM DOC 120 A
MU 7093 EN C
DUAL TRONIQUE
Page 17/69
This document is available on www.alma-alma.fr
SCENARIO 2
: Hose 1 is full of FOD, hose 2 and the common pipe are filled with FOD+. For the next delivery, we want to deliver
FOD with hose 1.
First step: Purge common pipe with menu
PRODUCT MOVEMENTS>HOSE PURGE
57
L
VOLUME OF PURGE
2 STEP PURGE
57
L
ST ART PURGE
3
L
PURGE / FOD / CPT2
67
L
END PURGE
67
L
BLOWING
67
L
PURGE FINISHED
67
L
DELIVERY TICKET
HOSE PURGE
PRODUCT
FOD
2000
L
PRODUCT MOVEMENTS
2000
L
DELIVERY ( FOD)
HOSE 1
HOSE 2
Choose
return
Choose
compartment
67
L
ENGINE CONTROL
67
L
DELIVERY ( FOD)
10
L
MANIFOLD EMPTY
33
L
PURGE / FOD / CPT2
66
L
ST OP ENGINE?
Second step: Purge hose 1 with menu
DELIVERY
2ND STEP HOSE F1
HOSE PURGE
67
L
DELIVERY ( FOD)
20
L
VOLUME OF PURGE
20
L
ST ART PURGE
8
L
PURGE / FOD / CPT2
20
L
END PURGE
20
L
BLOWING
20
L
PURGE FINISHED
Delivery
Choose
return
Choose
compartment
67
L
ST OP ENGINE?
Non-systematic phases.