![Alltech KEENAN MechFiber380 Скачать руководство пользователя страница 68](http://html1.mh-extra.com/html/alltech/keenan-mechfiber380/keenan-mechfiber380_operators-manual_2904134068.webp)
KEENAN
MechFiber380 Operator’s Manual
Revision D02 09
th
Sept 2020
68
16:
Blockage at auger
Use VFC-door to meter material intake into
auger.
Refer to Section 7.9 on feeding out to learn the
correct operation of the VFC-door.
In the unlikely event of a large blockage
preventing the machine from restarting using the
tractor, it may be necessary to enter the mixing
chamber to manually clear the blockage. Please
refer to Section 5, Point U, on safety.
17:
Blockage at rear feed-out conveyor
Use VFC-door to meter material intake into
auger.
Refer to Section 7.9 on feeding out for
information about the correct operation of the
VFC-door.
Ensure the conveyor belt rotates as VFC is
opened.
Check setting of priority flow valve (if fitted).
In the unlikely event of a large blockage
preventing the machine from restarting using the
tractor, it may be necessary to enter the mixing
chamber or gain access to the discharge auger
chamber to manually clear the blockage. Please
refer to Section 5, Point U, on safety.
Содержание KEENAN MechFiber380
Страница 2: ...KEENAN MechFiber380 Operator s Manual Revision D02 09th Sept 2020 2...
Страница 37: ...KEENAN MechFiber380 Operator s Manual Revision D02 09th Sept 2020 37 PART II Spare Parts...
Страница 43: ...KEENAN MechFiber380 Operator s Manual Revision D02 09th Sept 2020 43 11 5 Standard feed out parts...
Страница 46: ...KEENAN MechFiber380 Operator s Manual Revision D02 09th Sept 2020 46...
Страница 73: ...KEENAN MechFiber380 Operator s Manual Revision D02 09th Sept 2020 73...