Allstar ANSI/UL 325 Скачать руководство пользователя страница 8

ELECTRICAL POWER REQUIREMENTS

 

 

The GS4000 can be ordered for 115 Volts AC (VAC) or 230 VAC 
operation.    The AWG wire size for the electrical service depends on 
the distance of the operator from the breaker panel.  Refer to Table 1 
to determine the correct wire size.   
The DISTANCE column is the ideal distance from the breaker panel 

to the operator for a given wire size and voltage.   
 

NOTE!  FOR A BI-PARTING INSTALLATION, THERE 
WILL BE TWO MECHANICAL UNITS OPERATING AT 
THE SAME TIME.  IT WILL BE NECESSARY TO REDUCE 
THE LENGTHS IN TABLE 1 BY A FACTOR OF TWO.  
 

Class 2 low voltage wiring from external controls such as a key pad, 
card reader, telephone entry device, etc. must be brought to the 
GS4000 CONTROL BOX by a separate conduit  from the 115 VAC 
electrical hook up conduit.  Low voltage control wires MUST 
NEVER be routed in the same conduit as the HIGH VOLTAGE 
power wires. 

 

Note!

  The limit switch wires from the GS4000 CONTROL 

BOX to the GS4000 MECHANICAL UNIT ARE LOW 
VOLTAGE WIRES AND MUST BE ROUTED IN A LOW 
VOLTAGE CONDUIT TO THE CONTROL BOX.  

OTHER  VOLTAGES AND 3 PHASE SYSTEMS. 

 

The GS4000 can operate at other voltages or on three (3) phase 
systems.  To operate at 440 VAC it will be necessary to install an 
external step down transformer.  The transformer should be located 
in a separate electrical box and protected by suitable circuit breaker 
and/or fusing.  A 440 Volt rated switch should also be installed.  
Follow local electrical codes or the National Electrical Code.  The 
transformer selected should be UL LISTED and be rated for a 
minimum 700 Volt-Amperes (Watts).   
 
IF TWO MECHANICAL UNITS ARE TO BE USED FOR A BI-
PARTING GATE SYSTEM, THEN A 1000 VOLT-AMPERE/
WATT TRANSFORMER MUST BE USED. 

 

Operating from a three (3) phase line will require the use of a 230 
VAC rated GS4000. The GS4000 may be operated from a 230 Volt 
"Delta" line or a 120/208 "Y" line.  In either case, ONLY one "leg" 
of the three phase line will be used.  The unbalance of the line will be 
minimal since the full rate current of the GS4000 at 220 VAC is only 
2.2 amperes.  (4.4 Amperes for a bi-parting system.)  Connect any 
two wires of the three phase system to the 230 VAC GS4000  Tape 
the third wire carefully so that it does not short to any other object.  
(The "Y" system will have 4 wires, one of which will be the 
"common".  Make sure the common is NOT selected as one of the 
wires connected to the GS4000.)  It is always best to also pull a 
ground wire from the electrical service box to the GS4000 to ensure 
the frame is securely affixed to GROUND. 

 

SERVICE CONDUIT 

 

For new installations the conduit for the High Voltage may be 
brought to a junction box near where the GS4000 CONTROL BOX 
will be located or it may be brought directly to the Control Box. 

WARNING! 

AVOID ELECTROCUTION:  

DO NOT ROUTE LOW VOLTAGE WIRES IN SAME 

CONDUIT AS HIGH VOLTAGE WIRES.  FOLLOW 

ALL LOCAL ELECTRICAL CODES OR THE 

NATIONAL ELECTRICAL CODE.  

104952 

Figure 8:  Service Conduits 

B:

 PREPARING THE SITE 

AC POWER SOURCE

TYPICAL CONNECTIONS

50 FT

#14

100 FT

#14

NOTE:  DISTANCE IS TOTAL LENGTH OF
WIRE FROM CIRCUIT BREAKER IN THE 
MAIN PANEL TO THE GATE OPERATOR.

600 FT

400 FT

250 FT

150 FT

#6

#10

#8

#12

#6

#10

#8

#12

300 FT

75 FT
125 FT
200 FT

DISTANCE

WIRE

SINGLE GATE

SIZE

DOUBLE GATE

WIRE

SIZE

DISTANCE

120 VAC, 15A
Dedicated Circuit

HIGH VOLTAGE TERMINALS

GND

L2

L1

Table 1 

110112 

Содержание ANSI/UL 325

Страница 1: ...for Vehicular gate operators GATE STAR 4000 Model GS4000 Heavy Duty Commercial Vehicular Swing Gate Operator READ THIS MANUAL CAREFULLY BEFORE INSTALLATION OR USE SAVE THESE INSTRUCTIONS 104950 Seria...

Страница 2: ...ere to protect you and your equipment Pay close attention to these boxes as you follow the manual WARNING Indicates a MECHANICAL hazard of INJURY OR DEATH Gives instructions to avoid the hazard CAUTIO...

Страница 3: ...cal parts Whether the overload is activated before the Torque Limiter slips will depend upon the tightness of the adjustment of the Torque Limiter This adjustment will be explained in the final check...

Страница 4: ...re a handhold or toehold may be achieved injuries may occur when people put arms through the openings or children ride the gate by standing on the bars and holding on to the gate THIS POTENTIAL HAZARD...

Страница 5: ...the GS4000 Control Box cover is removed high voltage will be exposed EVEN IF THE RED POWER LIGHT IS NOT LIGHTED HIGH VOLTAGE AC MAY STILL BE PRESENT ON TERMINALS L1 AND L2 NEVER LEAVE THE INSTALLATIO...

Страница 6: ...r attention to the bolt pattern and the location of the mounting holes with respect to the center line of the gate post It is critical for the proper operation of the Arm that the center line of the s...

Страница 7: ...O K DO NOT USE ANY PVC INSULATED WIRE PVC insulation will absorb moisture that may affect Detector operation WIRE SIZE SHOULD BE 16 GA STRANDED OR LARGER VEHICLE DETECTOR LOOP BLANKING FOR SWING GATES...

Страница 8: ...lt Amperes Watts IF TWO MECHANICAL UNITS ARE TO BE USED FOR A BI PARTING GATE SYSTEM THEN A 1000 VOLT AMPERE WATT TRANSFORMER MUST BE USED Operating from a three 3 phase line will require the use of a...

Страница 9: ...or connecting accessory equipment to the control box terminal strip and for limit switch control wires 7 Four 1 2 diameter concrete redhead bolts with hex nuts flat washers and lock washers For attach...

Страница 10: ...n accordance with the drawing of Figure 6 INSTALLING THE GS4000 ARM Temporarily locate the Gate Bracket on the Gate with C clamps or by tack welding Install the gate bracket to the gate so the gate ar...

Страница 11: ...t entry Run a flexible water tight conduit from the service junction box to the GS4000 CONTROL BOX Pull three 14 wires from the service junction box in this conduit to the GS4000 Control Box If the GS...

Страница 12: ...eriod of time is long enough to damage solid state components and many times other components The key to success is a very low resistance path from the surge protector to ground for these currents in...

Страница 13: ...tion one operator must be a Left Hand unit and the other a Right Hand unit The two motors of the Bi Parting GS4000 s will be wired in parallel BOTH motors will run until both are shut off If the two g...

Страница 14: ...14 C INSTALLING THE OPERATOR Figure 15 Bi Parting Installation Limit Motor Wiring Diagram 110092...

Страница 15: ...sary as the GS4000 control board 24 VAC output is not referenced to ground See Figure 16 and the following text for proper connection FOUR WIRE RECEIVERS Four wire receivers replace the spade terminal...

Страница 16: ...from a location where it will be switched off at the GS4000 Power Switch CONNECTING THE VEHICLE DETECTOR For a REVERSING LOOP connection of the Vehicle Detector the relay or presence output of the Det...

Страница 17: ...ME DESCRIPTION 1 24 VAC Provides maximum 10 VA auxiliary power for accessories 2 24 VAC Provides maximum 10 VA auxiliary power for accessories 3 ALTERNATE Momentary input must be released and re enter...

Страница 18: ...continuous signal This input is active only when referenced to the opening direction it has no effect on the gate when closing or about to close If activated when the gate is opening the gate will st...

Страница 19: ...operation as described in the text that follows OPEN CLOSE PUSH BUTTON ENABLE DISABLE PATENT NO 6 611 205 Switch S1 controls the Push Button Enable Disable Feature SWITCH 1 OFF Activating the Open or...

Страница 20: ...the application of power 1 Check that the GS4000 power switch is off 2 Check that the breaker at the power panel is on 3 With a voltmeter on the proper scale check that the line voltage at terminals...

Страница 21: ...tact Sensor light comes on remains on until the connection is removed Observe that the both Motor Open and Motor Close lights are momentarily ON then the Motor Open light goes out and the Motor Close...

Страница 22: ...ment run the GS4000 open and closed several times to ensure that the positions set will be retained SMART SETTING MAXIMUM RUN TIMER The GS4000 is equipped with a Self adjusting MAximum Run Timer SMART...

Страница 23: ...LM IN BOTH DIRECTIONS OF TRAVEL REPEAT THIS TEST UNTIL YOU ARE SATISFIED YOU HAVE THE MOST SENSITIVE SETTING OF THE POTENTIOMETERS Disconnect the crank arm from the output shaft to permit re installat...

Страница 24: ...signs shipped with your GS4000 Operator See Figure 4 Page 5 of this manual must be installed in prominent positions on both sides of your gate Keep them clean and legible Read and put into practice th...

Страница 25: ...ontact sensors After adjusting the force or limits of travel retest the gate operator Failure to adjust and retest the gate operator properly can increase the risk of injury or death KNOW YOUR GATE AR...

Страница 26: ...26 1 2 3 4 5 7 6 8 9 10 11 12 13 14 15 16 17 18 19 20 106359 Figure 27 GS4000 Mechanical Unit Exploded View MECHANICAL UNIT EXPLODED VIEW...

Страница 27: ...HANDY BOX 1 7 8 DEEP 19 102735 HANDY BOX COVER WITH LABEL SCREWS 20 010231 CLUTCH DISC ITEM PART DESCRIPTION 1 109966 CONTROL BOX W COVER 2 110074 CONTROL BOARD 3 100997 CIRCUIT BREAKER 4 010412 ON O...

Страница 28: ...labor charges for dismantling or reinstalling a repaired or replaced unit or replacement batteries These warranties are in lieu of all other warranties either expressed or implied All implied warranti...

Отзывы: