20
53277
Section 4 Service Procedures
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the dryer(s) before servicing.
• Close gas shut-off valve to gas dryer(s) before servicing.
• Never start the dryer(s) with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the dryer is properly grounded.
W001R1
WARNING
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
NOTE: Do not let terminal block insulation drop
when removing the block. Insulation must be in
place between terminal block and bracket when
installing block.
c. Power Cord - Gas Models
(1) Remove access plate at rear of dryer.
(2) Remove strain relief holding power cord to
cabinet.
(3) Remove screw holding power cord ground
wire to terminal block bracket.
NOTE: Reconnect ground wire into same hole in
bracket when reinstalling power cord.
(4) Disconnect power cord at quick disconnect
plug and remove power cord out through
rear of dryer.
Figure 14
DRY950S
TERMINAL
BLOCK
SCREWS
BRACKET
SCREWS
ACCESS
PLATE
GROUND
WIRE
Figure 15
DRY951S
ACCESS
DOOR
SUPPORT
WASHER
PHILLIPS
HEAD
SCREW
APPLY
PRESSURE
HERE