90
Rockwell Automation Publication ICSTT-RM448J-EN-P - April 2018
Chapter 5
Install the AADvance System
Install Base Units and
Termination Assemblies:
Enclosure DIN Rail Assembly
Method
The following illustration shows how to it the backplanes on to Din rails and
use the retaining clips and lever to hold them in position.
Figure 15 - Fit I/O Base Unit onto DIN Rails
For a system build that uses DIN rails do the following:
1. Install the
DIN rails
.
• The AADvance controller will be mounted onto one or more pairs of
parallel DIN rails. For each pair of rails, mount the lower rail with its
center line 101.0mm below the center line of the upper rail. M5
thread rolling screws are suitable.
IMPORTANT
Fit the rubber connector protection cover to exposed connectors that are not
joined to another base unit.
Содержание AADvance
Страница 4: ...4 Rockwell Automation PublicationICSTT RM448J EN P April 2018...
Страница 6: ...6 Rockwell Automation PublicationICSTT RM448J EN P April 2018 Summary of Changes...
Страница 14: ...14 Rockwell Automation PublicationICSTT RM448J EN P April 2018 Chapter 1 The AADvance System...
Страница 62: ...62 Rockwell Automation PublicationICSTT RM448J EN P April 2018 Chapter 2 The AADvanceSafety Controller...
Страница 66: ...66 Rockwell Automation PublicationICSTT RM448J EN P April 2018 Chapter 3 Application Resource Development...
Страница 132: ...132 Rockwell Automation PublicationICSTT RM448J EN P April 2018 Chapter 5 Install the AADvance System...
Страница 150: ...150 Rockwell Automation PublicationICSTT RM448J EN P April 2018 Chapter 8 Dismantling the AADvance System...