
Rockwell Automation Publication 1407-UM001H-EN-P - November 2014
CGCM Unit Startup
#HAPTER
6ERIFY/PERATIONOF,IMITER&UNCTIONSAND$IODE-ONITOR
Perform the following tests to verify Limiter Functions and Diode Monitor
operation.
6OLTS(Z/PERATION
Perform this test with the generator operating unloaded in Constant Speed mode
and constant voltage AVR mode.
Follow these steps to test the Volts/Hz operation.
1.
With the generator circuit breaker open, adjust the prime mover speed
down to just above the configured V/Hz upper knee frequency.
Verify that the voltage remains constant.
2.
Adjust the prime mover speed down to below the configured V/Hz upper
knee frequency.
Verify the voltage decreases at the configured upper slope rate.
3.
Adjust the prime mover speed down to below the configured V/Hz lower
knee frequency.
Verify the voltage decreases at the configured lower slope rate.
5NDEREXCITATION,IMITING5%, /PERATION
Perform this test with the generator operating in parallel (droop or PF/VAR
control) with a large power source that is maintaining constant voltage.
Follow these steps to test the UEL operation.
1.
Disable the UEL function.
2.
Set the online under-excitation limit for 5% VARs into the generator.
3.
Adjust the VARs into the generator for 15% at 25% load to create an
under-excited condition
4.
Enable the UEL function.
This creates a step change into the UEL limit.
5.
Observe the response of the excitation current reported by the CGCM
unit.
6.
Adjust the UEL gains as required to obtain the desired stable response.
7.
Verify stable performance of the UEL by testing the machine from
25…100% real power loading while under excited.
8.
Increase the excitation above the UEL limit.
9.
Return the UEL settings to the values determined for the application.
Содержание 1407-CGCM
Страница 1: ...Combination Generator Control Module Catalog Numbers 1407 CGCM User Manual...
Страница 4: ...Rockwell Automation Publication 1407 UM001H EN P November 2014 3UMMARY OF HANGES OTES...
Страница 8: ...Rockwell Automation Publication 1407 UM001H EN P November 2014 0REFACE OTES...
Страница 12: ...Rockwell Automation Publication 1407 UM001H EN P November 2014 HAPTER General Information OTES...
Страница 14: ...Rockwell Automation Publication 1407 UM001H EN P November 2014 HAPTER Installation IGURE 5NIT VERALL IMENSIONS...
Страница 70: ...Rockwell Automation Publication 1407 UM001H EN P November 2014 HAPTER CGCM Unit Operation OTES...
Страница 106: ...Rockwell Automation Publication 1407 UM001H EN P November 2014 HAPTER CGCM Unit Configuration OTES...
Страница 126: ...Rockwell Automation Publication 1407 UM001H EN P November 2014 HAPTER CGCM Unit Startup OTES...
Страница 152: ...Rockwell Automation Publication 1407 UM001H EN P November 2014 HAPTER CGCM Unit Software Interface OTES...
Страница 168: ...Rockwell Automation Publication 1407 UM001H EN P November 2014 HAPTER Troubleshooting OTES...
Страница 196: ...Rockwell Automation Publication 1407 UM001H EN P November 2014 PPENDIX CGCM Unit Math Models OTES...
Страница 212: ...Rockwell Automation Publication 1407 UM001H EN P November 2014 PPENDIX Specifications OTES...
Страница 250: ...Rockwell Automation Publication 1407 UM001H EN P November 2014 NDEX OTES...
Страница 251: ......