3–20
Regenerative Brake Operation
Control and Signal Wiring
Sync Cable
The sync cable that is shipped with the
1336 REGEN Precharge unit connects
the required startup, diagnostic and
control signals between the 1336
REGEN Converter Control Board and
the 1336 REGEN Precharge Board. The
ribbon cable shield provided at the
converter end must be connected to the
Control Board Shield Connector J14 as
shown in Figure 3.13 to maintain signal
integrity.
1336 REGEN
PRECHARGE
UNIT
1336 REGEN
CONVERTER
1321 3% LINE REACTOR
1336 REGEN
Precharge-to-Converter
Sync Cable Installation
Control Board
Connector J13
Control Board
Connector J14
Precharge Board
Connector J1
R
2
T
1
S
1
R
1
S
2
T
2
Sync Cable Length
2 Meter
or
4 Meter
Important:
The Precharge-to-Converter
Sync Cable shipped with the 1336 REGEN
Precharge Unit must be connected between
the Precharge Board in the Precharge Unit
and the Control Board in the 1336 REGEN
Converter for 1336 REGEN Package operation.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com