ALIMAK 34786 - 1/01
Extra reinforcement of concrete slab
– for hoist with landing equipment on vertical pipe support
The concrete slab must have additional reinforcement in order to
carry the extra load due to the vertical pipes, landing equipment
and the extra load, due to the landings (people, buggies, materials,
etc).
The extra reinforcement is only necessary within the areas shown
in the picture below. The layer of reinforcement should be placed
20 mm (.8 in.) below the upper edge of the slab.
Note that a concrete slab which forms part of a foundation pit
does not require this extra reinforcement.
Cross-section of concrete slab
Extra reinforcement
Normal reinforcement
SCANDO
single car
Face of building
single car
dual cars
220
50
50
50
Ø 10 s 200
(8 3/4’’)
20 mm
(.8 in)
C2
B1
B1
C2
C3
SCANDO
dual cars
C3
1800
Ø 10 s 200
50
(5’- 10 3/4’’)
(2’’)
g 6
g 7
g 8
G
3
Содержание Scando 650 DOL
Страница 4: ......
Страница 6: ...2 8 m car base structure 9 2 1 4 3 5 m car base structure 11 5 3 4 ...
Страница 16: ...A10 ...
Страница 32: ......
Страница 38: ...B5 ...
Страница 92: ......
Страница 94: ......
Страница 106: ......
Страница 108: ......
Страница 116: ...H8 ...
Страница 132: ......
Страница 134: ......
Страница 140: ......
Страница 141: ...HOIST capacity 2400 kg or 24 passengers 9101286 101 ...
Страница 142: ......
Страница 144: ......