Landing run-offs in conjunction with vertical pipes
The sum of the vertical pipes’, pipe supports’, landing beams’
and landing equipment’s own weight means that the combined
payload on the landing run-offs will be reduced with increasing
mast height.
The maximum allowable payload on all the landings combined
is shown on the diagram to the right. The load is understood to
be equally distributed on the respective landing run-offs.
ALIMAK 34813 - 1/01